Laserfiche WebLink
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-60f <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />ons <br />Page 2 of 3 <br />EXHIBIT "F" <br />TERMS AND CONDITIONS OF CONSTRUCTION IN DEPARTMENT <br />RIGHT OF WAY <br />effect, or performance of this Agreement including, but not limited to, the Recipient's use, <br />occupancy or possession of Department right-of-way. The Parties agree that this Agreement does <br />not, and shall not be construed to, grant credit for any future transportation concurrency <br />requirements pursuant to Chapter 163, Florida Statutes. <br />g. The Recipient shall not cause any liens or encumbrances to attach to any portion of the <br />Department's property, including but not limited to, the Department's right-of-way. <br />h. The Recipient shall perform all required testing associated with the design and construction of the <br />Project. Testing results shall be entered into the department's Materials Testing and Certification <br />database application and the department must provide the final Materials Certification for the <br />Project. The Department shall have the right to perform its own independent testing during the <br />course of the Project. <br />The Recipient shall exercise the rights granted herein and shall otherwise perform this Agreement <br />in a good and workmanlike manner, with reasonable care, in accordance with the terms and <br />provisions of this Agreement and all applicable federal, state, local, administrative, regulatory, <br />safety and environmental laws, codes, rules, regulations, policies, procedures, guidelines, <br />standards and permits, as the same may be constituted and amended from time to time, including, <br />but not limited to, those of the Department, applicable Water Management District, Florida <br />Department of Environmental Protection, Environmental Protection Recipient, the Army Corps of <br />Engineers, the United States Coast Guard and local governmental entities. <br />j. If the Department determines a condition exists which threatens the public's safety, the Department <br />may, at its discretion, cause construction operations to cease and immediately have any potential <br />hazards removed from on, under, or over its right-of-way at the sole cost, expense, and effort of <br />the Recipient. The Recipient shall bear all construction delay costs incurred by the Department. <br />k. The Recipient shall be responsible to maintain and restore all features that might require relocation <br />within the Department right-of-way. <br />I. The Recipient will be solely responsible for clean up or restoration required to correct any <br />environmental or health hazards that may result from construction operations. <br />m. The acceptance procedure will include a final "walk-through" by Recipient and Department <br />personnel. Upon completion of construction, the Recipient will be required to submit to the <br />Department final as -built plans and an engineering certification that construction was completed in <br />accordance to the plans. Submittal of the final as -built plans shall include one complete set of the <br />signed and sealed plans on 11" X 17" plan sheets and an electronic copy prepared in Portable <br />Document Format (PDF). Prior to the termination of this Agreement, the Recipient shall remove its <br />presence, including, but not limited to, all of the Recipient's property, machinery, and equipment <br />from Department right-of-way and shall restore those portions of Department right of way disturbed <br />or otherwise altered by the Project to substantially the same condition that existed immediately <br />prior to the commencement of the Project. <br />In. If the Department determines that the Project is not completed in accordance with the provisions <br />of this Agreement, the Department shall deliver written notification of such to the Recipient. The <br />Recipient shall have thirty (30) days from the date of receipt of the Department's written notice, or <br />such other time as the Recipient and the Department mutually agree to in writing, to complete the <br />Project and provide the Department with written notice of the same (the "Notice of Completion"). If <br />51 <br />