My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-021
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 11:45:40 AM
Creation date
2/11/2021 11:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/02/2021
Control Number
2021-021
Agenda Item Number
12.H.1.
Entity Name
Bowman Consulting Group, Ltd
Subject
West Wabasso Septic to Sewer Phase III, CCNA2018 Work Order No. 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)Bowman Consulting Group <br />Mr. Eric Flavell, P.E., F -ASCE <br />October 19, 2020 <br />Vertical Datum of 1988 (NAVD 88) vertical values for the collection of data and <br />to be used as site benchmarks. <br />b. Establish all of the of the right of way lines and approximate lot lines for the Plat of <br />Hillside Subdivision and 200' of unplatted 581h Avenue per the record information <br />available through the Indian River County records and the Florida Department of <br />Transportation (FDOT). <br />c. Map all visible above ground existing conditions utilizing conventional survey <br />and GPS real-time kinematic (RTK) methods along the route. Collect any <br />marked underground utilities. (This scope assumes that any underground <br />utilities that need to be mapped will be identified by others prior to <br />commencement of the existing conditions survey.) <br />c. Fly a predefined route in accordance with all FAA part 107 regulations with a <br />DJI Phantom 4 Pro drone to obtain aerial images. Aerial images will be <br />processed via Pix4D photogrammetry software for image only. <br />d. Draw the existing conditions utilizing Autocad Civil 3D in State Plane <br />Coordinates. Plot the existing conditions on a signed and sealed survey map. <br />Section III. SUBCONSULTANTS <br />TBD for septictank locations at time of survey (Subconsultants fee covered under Fee Schedule <br />task 2) <br />Section IV. CLIENT'S RESPONSIBILITY <br />a. Access to the project site and upfront communication with homeowners <br />b. Identification and marking of underground utilities <br />Section V. DELIVERABLES <br />ISS will provide the following deliverables. <br />a. Task 1 - Existing Conditions Map <br />Three copies of signed and sealed survey maps and one digital copy delivered <br />on CD or thumb drive. <br />Section VI. SCHEDULE <br />ISS will begin survey field work for each task within one week of receiving the signed <br />proposal from BCG. Field work and drafting will. be complete within five weeks of <br />commencement. Survey map deliverables will be provided to BCG within five days thereafter. <br />Section VII. COMPENSATION <br />BCG shall compensate ISS a lump sum fee of Thirty -Four Thousand Four Hundred Fifty <br />Dollars. ($34,450.00) for the scope of services specified in this task order. <br />Any additional unforeseen expenses will be identified for approval from BCG before incurring <br />and billed with the final invoice. <br />ISS TEAM 7175 Murrell Road, Melbourne, FL 32940 Tel. (321)622-4646 <br />
The URL can be used to link to this page
Your browser does not support the video tag.