My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-021
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 11:45:40 AM
Creation date
2/11/2021 11:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/02/2021
Control Number
2021-021
Agenda Item Number
12.H.1.
Entity Name
Bowman Consulting Group, Ltd
Subject
West Wabasso Septic to Sewer Phase III, CCNA2018 Work Order No. 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blood Hound <br />750 Patricks Place <br />Brownsburg, IN 46112 <br />ESTIMATE <br />Created Date 10/19/2020 <br />Estimate Number 56955 <br />Customer <br />Bowman Consulting Group Name <br />Billing Phone <br />(321) 255-5434 Phone <br />Billing Address <br />12355 Sunvalley Drive Email <br />Suite 520 <br />Reston, VA 20191 <br />US <br />Job Site Location <br />Wabasso SUE project, 85th St. & 58th Ave., <br />Sebastian, Florida, 32958 <br />Zachary Komninos <br />(321) 270-8982 <br />zkomninos@bowmanconsulting.com <br />Advantage Locate (hourly) 7.00$200.00 $1,400.00 <br />Mob - Vac Ek (Hrly) 4100-$200.00 _.. $800.00 <br />Vacuum Excavation (Hourly) 9.00 $225.00 $2,025.00 <br />Grand Total $4,225.00 <br />Scope of Work <br />Customer SOW Design engineering <br />BHUG SOW Client has requested an estimate for the following Scope of Work: <br />• The following work is being performed to Quality Level B standards in accordance with CI/ASCE <br />38-02. <br />• Client has requested an estimate to horizontally locate detectable underground utilities within <br />the Yellow Hi -lighted area, more specifically, "100' north and south of the Red center line at <br />Station 593+20.00, to include full ROW". <br />• A BHUG generated image, is attached for reference. If incorrect please advise. <br />• EM and Real -Time GPR Locating equipment will both be utilized to locate and mark the <br />utility lines. A not to scale digital field sketch will be provided of our discoveries for surveying <br />purposes. We will also provide pictures and the raw GPR data for review. <br />• Customer is advised the horizontal portion of this estimate is based on a 2 -hour minimum. Any <br />additional time required on site to complete the task beyond the 2 -hour minimum will be <br />invoiced in 15 -minute increments @ $50 per increment, upon customer approval. Mobilization <br />for this portion has been waived. <br />• Customer is advised that Blood Hound utilizes water-based paint and flags to identify any discoveries <br />onsite. If this is an issue, Blood Hound must be made aware of this when scheduling. All discoveries <br />will be painted and flagged for surveying purposes. <br />• All findings will be marked according to APWA standard. <br />• Any available as-builts, engineered or other record drawings, if available, should be supplied to BHUG <br />prior to commencement of field work. <br />• Estimate does not include any camera or surveying services. <br />Phone #: 888-858-9830 Fax #: 888-858-9829 Email: BHI@bhug.com Website: bhug.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.