Laserfiche WebLink
4/30/18 <br />Estimated Staff Loading For: <br />Indian River Co. Utilities - West Wabasso Septic to sewer <br />TASK 3r Proj Mg Sr Engr Proj Engr Engr Sr Dsgnr Clerical TOTAL <br />Task - Permitting 0 <br />1. FDEP Permit 59th & 58th 2 4 8 14 <br />2. FDEP Permit 61st 2 4 8 14 <br />3. Permit Fee ($500) 5 2 7 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />N <br />Staff By Category Totals <br />4 8 16 <br />5 0 2 <br />35 <br />Billing Rate ($/hr) <br />$165 $150 $130 <br />$100 $105 $50 <br />Total Personnel Cost ($) <br />$660 $1,200 $2,080 <br />$500 $0 $100 <br />$4,540 <br />Staffing Ratio (% of total hrs) <br />11.4 22.9 45.7 <br />14.3 0.0 5.7 <br />Average Personnel Cost ($/hr) <br />129.71 <br />Description of Other Project Costs <br />VALUE ($) <br />Repro/Misc @ 5% <br />$227 <br />Total of other costs ($) <br />$227 <br />Total Estimated Pi <br />West Wabasso Fee Est.xls <br />