Laserfiche WebLink
EXHIBIT A <br />AMENDMENT NO. 1 TO WORK ORDER NO.2 <br />INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT <br />SEGMENT 3 CELL 1 LANDFILL GAS COLLECTION SYSTEM EXPANSION <br />ENGINEERING SERVICES DURING CONSTRUCTION <br />This Amendment No. 1 to Work Order No. 2, when executed, shall be incorporated in and become <br />part of the Agreement for Consulting Services between Indian River County Solid Waste Disposal <br />District (SWDD) and CDM Smith Inc., (CONSULTANT), dated July 18, 2017, hereafter referred to as <br />the AGREEMENT. <br />PROJECT BACKGROUND <br />The SWDD has requested that CONSULTANT prepare this Amendment No. 1 to Work Order No. 2 to <br />provide professional engineering services during construction for the proposed Class I Landfill <br />Segment 3 Cell 1 landfill gas (LFG) collection system expansion. The proposed landfill collection <br />system expansion is for the construction of vertical and horizontal landfill gas collection wells, <br />header pipes, compressed air piping, and leachate forcemains. The design and permitting was <br />completed and the project was advertised to bid in Indian River County Bid No. 2021006. Bid <br />opening was January 6, 2021. <br />The Scope of Services for Engineering Services During Construction, of the landfill gas expansion <br />system is described below: <br />SCOPE OF SERVICES <br />CONSULTANT will provide engineering services during construction to act as the OWNER's <br />representative during the construction of the project. Based on recent discussions with SWDD staff <br />and our familiarity with the landfill site design of the project, the proposed Scope of Services <br />includes the following tasks as a continuation of the previously approved tasks: <br />TASK 1.0 - PROJECT QUALITY MANAGEMENT <br />Activities performed under this task consist of those generally administrative functions required to <br />maintain the project on schedule, within budget, and that the quality of the work products defined <br />within this scope is consistent with CONSULTANT's standards, SWDD's requirements, and FDEPs <br />permit requirements. <br />Subtask 1.4 - Construction Quality Management <br />CONSULTANT's project manager will manage the independent review of CONSULTANT's <br />deliverables, monthly project status reviews, and project close-out activities. CONSULTANT will <br />meet with SWDD staff for project planning and coordination, as needed. CONSULTANT will perform <br />quality technical reviews on the construction phase CONSULTANT deliverables such as record <br />drawings and the Florida Department of Environmental Protection Certifications of Construction <br />Completion. Preparation of invoices and project administration will also be performed under this <br />task. <br />Smith A-1 ii2943_IRC LFG EXP Exhibit A <br />