My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-028
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:48:33 AM
Creation date
3/1/2021 1:59:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/16/2021
Control Number
2021-028
Agenda Item Number
8.I.
Entity Name
City of Sebastian
Subject
Roseland Road Sewer expansion Cost Share Agreement
Donald MacDonald Campground
Area
Agreement Roseland Road and Corporate Park Drive to Sunset Drive
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseland Forcemain Extension & Donald MacDonald Campground Sanitary Sewer Collection / Transmission System <br />IRC BID #2020039 Unit Item Cost Sheet <br />Indian River County Department of Utility Services 2020 Labor Contract <br />1of3 <br />CK Construction <br />Utililites <br />CoSeb <br />Parks & Rec <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price <br />Installed Unit <br />Price <br />Total Unit Price <br />(Material +Installation) <br />SECTION A - UNIT COST/PRICES <br />Al <br />Mobilization <br />(b) Non - Emergency Event <br />1 <br />EA <br />$ <br />$ <br />1,500.00 <br />$ <br />1,500.00 <br />$ <br />500.00 <br />$ 500.00 <br />$ <br />500.00 <br />A2 <br />Temporary Traffic Control <br />(b) Arterial Roadway <br />2125 <br />L.F. <br />$ <br />$ <br />1.15 <br />$ <br />2,443.75 <br />$ <br />814.59 <br />$ 814.58 <br />$ <br />814.58 <br />A3 <br />Video Documentation <br />(a) <br />Pre -Construction Video <br />3,435 <br />L.F. <br />$ <br />$ <br />0.60 <br />$ <br />2,061.00 <br />$ <br />687.00 <br />$ 687.00 <br />$ <br />687.00 <br />(b) <br />Post -Construction Video <br />3,435 <br />L.F. <br />$ <br />$ <br />0.60 <br />$ <br />2,061.00 <br />$ <br />687.00 <br />$ 687.00 <br />$ <br />687.00 <br />A4 <br />Force Main - PVC <br />(a) <br />2 -inch <br />150 <br />L.F. <br />$ 1.01 <br />$ <br />14.46 <br />$ <br />2,320.50 <br />$ <br />- <br />$ - <br />$ <br />2,320.50 <br />(c) <br />6 -inch <br />2125 <br />L.F. <br />$ 5.42 <br />$ <br />19.47 <br />$ <br />52,891.25 <br />$ <br />17,630.42 <br />$ 17,630.42 <br />$ <br />17,630.41 <br />A7 <br />PVC Gravity Sewer - 8 inch <br />(a) 0'-6' <br />302 <br />L.F. <br />$ 5.51 <br />$ <br />18.65 <br />$ <br />7,296.32 <br />$ <br />- <br />$ - <br />$ <br />7,296.32 <br />(b) 6'-8' <br />418 <br />L.F. <br />$ 5.51 <br />$ <br />20.20 <br />$ <br />10,746.78 <br />$ <br />- <br />$ <br />$ <br />10,746.78 <br />(c) 8'40' <br />253 <br />L.F. <br />$ 5.51 <br />$ <br />22.04 <br />$ <br />6,970.15 <br />$ <br />$ <br />$ <br />6,970.15 <br />(d) 10'-12' <br />225 <br />L.F. <br />$ 5.51 <br />$ <br />26.94 <br />$ <br />7,301.25 <br />$ <br />$ <br />$ <br />7,301.25 <br />(f) Cost Credit <br />1198 <br />L.F. <br />NA <br />$ <br />0.10 <br />$ <br />119.80 <br />$ <br />$ <br />$ <br />119.80 <br />A9 <br />Connect to Existing Pipe (<12") <br />(a) <br />1 (<32") <br />1 <br />EA <br />$ 385.74 <br />$ <br />1,467.20 <br />$ <br />1,852.94 <br />$ <br />617.66 <br />$ 617.64 <br />$ <br />617.64 <br />(b) <br />(>=12") <br />0 <br />EA <br />$ 1,300.38 <br />$ <br />1,508.17 <br />$ <br />- <br />All <br />Precast Concrete Manhole -Unlined <br />(a) 0'-6' <br />4 <br />EA. <br />$ 2,427.93 <br />$ <br />848.61 <br />$ <br />13,106.16 <br />$ <br />- <br />$ - <br />$ <br />13,106.16 <br />(b) 6'-8' <br />3 <br />EA. <br />$ 2,811.46 <br />$ <br />1,120.18 <br />$ <br />11,794.92 <br />$ <br />$ <br />$ <br />11,794.92 <br />(c) 8'-10' <br />2 <br />EA. <br />$ 3,360.30 <br />$ <br />1,697.24 <br />$ <br />10,115.08 <br />$ <br />$ <br />$ <br />10,115.08 <br />Al2 <br />Mechanical Joint Bell Restraints -PVC <br />(c) 6 -inch <br />1 56 <br />EA. <br />$ 52.90 <br />$ <br />62.72 <br />$ <br />6,474.72 <br />$ <br />2,158.24 <br />$ 2,158.24 <br />$ <br />2,158.24 <br />A16 <br />Ductile Iron Fittings <br />0.65 <br />TONS <br />$ 8.91 <br />$ <br />5,091.92 <br />$ <br />3,315.54 <br />$ <br />1,105.18 <br />$ 1,105.18 <br />$ <br />1,105.18 <br />(C-153 Compact Fittings) <br />(Interior Epoxy Coated) <br />1of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.