Laserfiche WebLink
Roseland Forcemain Extension & Donald MacDonald Campground Sanitary Sewer Collection / Transmission System <br />IRC BID #2020039 Unit Item Cost Sheet <br />Indian River County Department of Utility Services 2020 Labor Contract <br />1of3 <br />CK Construction <br />Utililites <br />CoSeb <br />Parks & Rec <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price <br />Installed Unit <br />Price <br />Total Unit Price <br />(Material +Installation) <br />SECTION A - UNIT COST/PRICES <br />Al <br />Mobilization <br />(b) Non - Emergency Event <br />1 <br />EA <br />$ <br />$ <br />1,500.00 <br />$ <br />1,500.00 <br />$ <br />500.00 <br />$ 500.00 <br />$ <br />500.00 <br />A2 <br />Temporary Traffic Control <br />(b) Arterial Roadway <br />2125 <br />L.F. <br />$ <br />$ <br />1.15 <br />$ <br />2,443.75 <br />$ <br />814.59 <br />$ 814.58 <br />$ <br />814.58 <br />A3 <br />Video Documentation <br />(a) <br />Pre -Construction Video <br />3,435 <br />L.F. <br />$ <br />$ <br />0.60 <br />$ <br />2,061.00 <br />$ <br />687.00 <br />$ 687.00 <br />$ <br />687.00 <br />(b) <br />Post -Construction Video <br />3,435 <br />L.F. <br />$ <br />$ <br />0.60 <br />$ <br />2,061.00 <br />$ <br />687.00 <br />$ 687.00 <br />$ <br />687.00 <br />A4 <br />Force Main - PVC <br />(a) <br />2 -inch <br />150 <br />L.F. <br />$ 1.01 <br />$ <br />14.46 <br />$ <br />2,320.50 <br />$ <br />- <br />$ - <br />$ <br />2,320.50 <br />(c) <br />6 -inch <br />2125 <br />L.F. <br />$ 5.42 <br />$ <br />19.47 <br />$ <br />52,891.25 <br />$ <br />17,630.42 <br />$ 17,630.42 <br />$ <br />17,630.41 <br />A7 <br />PVC Gravity Sewer - 8 inch <br />(a) 0'-6' <br />302 <br />L.F. <br />$ 5.51 <br />$ <br />18.65 <br />$ <br />7,296.32 <br />$ <br />- <br />$ - <br />$ <br />7,296.32 <br />(b) 6'-8' <br />418 <br />L.F. <br />$ 5.51 <br />$ <br />20.20 <br />$ <br />10,746.78 <br />$ <br />- <br />$ <br />$ <br />10,746.78 <br />(c) 8'40' <br />253 <br />L.F. <br />$ 5.51 <br />$ <br />22.04 <br />$ <br />6,970.15 <br />$ <br />$ <br />$ <br />6,970.15 <br />(d) 10'-12' <br />225 <br />L.F. <br />$ 5.51 <br />$ <br />26.94 <br />$ <br />7,301.25 <br />$ <br />$ <br />$ <br />7,301.25 <br />(f) Cost Credit <br />1198 <br />L.F. <br />NA <br />$ <br />0.10 <br />$ <br />119.80 <br />$ <br />$ <br />$ <br />119.80 <br />A9 <br />Connect to Existing Pipe (<12") <br />(a) <br />1 (<32") <br />1 <br />EA <br />$ 385.74 <br />$ <br />1,467.20 <br />$ <br />1,852.94 <br />$ <br />617.66 <br />$ 617.64 <br />$ <br />617.64 <br />(b) <br />(>=12") <br />0 <br />EA <br />$ 1,300.38 <br />$ <br />1,508.17 <br />$ <br />- <br />All <br />Precast Concrete Manhole -Unlined <br />(a) 0'-6' <br />4 <br />EA. <br />$ 2,427.93 <br />$ <br />848.61 <br />$ <br />13,106.16 <br />$ <br />- <br />$ - <br />$ <br />13,106.16 <br />(b) 6'-8' <br />3 <br />EA. <br />$ 2,811.46 <br />$ <br />1,120.18 <br />$ <br />11,794.92 <br />$ <br />$ <br />$ <br />11,794.92 <br />(c) 8'-10' <br />2 <br />EA. <br />$ 3,360.30 <br />$ <br />1,697.24 <br />$ <br />10,115.08 <br />$ <br />$ <br />$ <br />10,115.08 <br />Al2 <br />Mechanical Joint Bell Restraints -PVC <br />(c) 6 -inch <br />1 56 <br />EA. <br />$ 52.90 <br />$ <br />62.72 <br />$ <br />6,474.72 <br />$ <br />2,158.24 <br />$ 2,158.24 <br />$ <br />2,158.24 <br />A16 <br />Ductile Iron Fittings <br />0.65 <br />TONS <br />$ 8.91 <br />$ <br />5,091.92 <br />$ <br />3,315.54 <br />$ <br />1,105.18 <br />$ 1,105.18 <br />$ <br />1,105.18 <br />(C-153 Compact Fittings) <br />(Interior Epoxy Coated) <br />1of3 <br />