Laserfiche WebLink
3of3 <br />CK Construction <br />Utililites <br />CoSeb <br />Parks & Rec <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price <br />Installed Unit <br />Price <br />Total Unit Price <br />(Material +Installation) <br />SECTION C - HDPE Piping & Horizontal Directional Boring <br />C2 I Horizontal Directional Boring (HDPE) -HDD <br />(b) 4 -inch 1 70 1 L.F. <br />SECTION D: Time and Materials Rates (Lift Station Installation) <br />1 $ 4.96 <br />1 $ <br />178.08 <br />1 $ <br />12,812.80 <br />$ <br />$ <br />- <br />$ <br />12,812.80 <br />D1 Equipment Hourly Rates <br />(a) Trackhoe (specify model) <br />(large) <br />80 <br />Hr. <br />NA <br />$ <br />115.00 <br />$ <br />9,200.00 <br />$ <br />$ <br />- <br />$ <br />9,200.00 <br />(c) Front end Loader <br />80 <br />Hr. <br />NA <br />$ <br />105.00 <br />$ <br />8,400.00 <br />$ <br />$ <br />- <br />$ <br />8,400.00 <br />(h) Crew Truck with hand tools <br />80 <br />Hr. <br />NA <br />$ <br />25.00 <br />$ <br />2,000.00 <br />$ <br />$ <br />- <br />$ <br />2,000.00 <br />(i) Trash Pump 3" <br />80 <br />Hr. <br />NA <br />$ <br />10.00 <br />$ <br />800.00 <br />$ <br />$ <br />- <br />$ <br />800.00 <br />(n) I Cut off saw (14") <br />80 <br />Hr. <br />NA <br />$ <br />6.00 <br />$ <br />480.00 <br />$ <br />$ <br />- <br />$ <br />480.00 <br />D2 Crew Hourly Rates <br />(c) Supervisor <br />14 <br />Hr. <br />NA <br />$ <br />95.00 <br />$ <br />1,330.00 <br />$ <br />$ <br />$ <br />1,330.00 <br />(fl 5 man crew includes 1 supervisor <br />80 <br />Hr. <br />NA <br />$ <br />305.00 <br />$ <br />24,400.00 <br />$ <br />$ <br />$ <br />24,400.00 <br />SECTION E: Miscellaneous Materials & Sub -Contractors <br />El IDewatering Pump (Lift Station Install.) <br />1 <br />LS <br />$ <br />4,380.95 <br />$ <br />- <br />$ <br />$ <br />4,380.95 <br />Total Labor Contract (CK Construction): <br />$ <br />298,269.08 <br />$ <br />28,565.40 <br />$ <br />28,565.34 <br />$ <br />241,138.34 <br />SECTION F: Direct Purchase Items <br />F1 <br />Hydra Service, Inc. Lift Station Package <br />(4' dia. x 8.5' deep) <br />1 <br />Ea. <br />$ <br />22,982.00 <br />$ <br />- <br />$ <br />- <br />$ <br />22,982.00 <br />F2 Sub -Contractor -Paragon Electric <br />1 <br />LS <br />$ <br />14,277.00 <br />$ <br />$ <br />$ <br />14,277.00 <br />F3 Stuart Fence <br />1 <br />LS <br />$ <br />4,400.00 <br />$ <br />- <br />$ <br />$ <br />4,400.00 <br />F4 I Survey-Stakeout(MMT) <br />i <br />I LS <br />$ <br />5,500.00 <br />$ <br />733.33 <br />$ <br />733.33 <br />$ <br />4,033.34 <br />Total Project: <br />$ <br />345,428.08 <br />$ <br />29,298.73 <br />$ <br />29,298.67 <br />$ <br />286,830.68 <br />3of3 <br />