Laserfiche WebLink
AQUA -AEROBIC SYSTEMS, INC. <br />A Metawater Company <br />Proposal#: 159824 <br />TO: Indian River County PROJECT: INDIAN RIVER CTY SOUTH WWTP FL <br />ATN: Richard Meckes PROPOSAL DATE: December 8, 2020 <br />CC: EnviroSales of Florida, Inc. / ph#: 941/343-9244 / fx#: 941/343-9245 <br />Chuck Hlavach <br />The following Notes apply to Aqua -Aerobic Systems' proposal: <br />- We are pleased to quote, for acceptance within 90 days of this date, prices and terms on goods listed below. <br />- Equipment will be furnished by Aqua -Aerobic Systems, Inc. with unloading of goods, and civil work (if required) by <br />the Buyer. <br />- The proposal is based on the rebuild of two 16'x 50' traveling bridge filters, with 12" wide cells and a media depth of <br />11 ". Customer to confirm dimensions. <br />- Aqua Aerobic Systems shall retain the services of a contractor to perform the following: <br />TURNKEY TEARDOWN: <br />A. The contractor shall remove the media above and below the porous plates. Note that the existing media would <br />be disposed of at the jobsite. If the media needs to be disposed of at a landfill, then additional costs would apply. <br />B. Contractor will remove all % - 20 hardware, angles, rods, and old porous plates. After removal all cells and <br />ledges will be cleaned, inspected, and prepared for the new porous plates. <br />C. The washwater, skimmer and backwash pumps shall be removed. <br />D. The existing drive train including wheels, shafts, bearings, drive: motor and gearbox shall be removed. <br />E. The existing backwash shoe and tensioning assembly shall be removed. <br />F. The existing wear strip shall be removed. <br />TURNKEY INSTALLATION: <br />a. The new porous plates, angles, spacer rods, sealant, and hardware will be installed. <br />b. While caulking is curing, a light test will be performed to assure the plates are installed properly for the plant. <br />c. The new filter media shall be installed via pneumatic truck delivery. <br />d. New backwash shoes and tensioning assemblies shall be installed. <br />e. The washwater, skimmer and backwash pumps shall be replaced, and wired in by a certified electrician. <br />f. A new backwash wear strip shall be installed in the effluent channel. <br />g. A new drive train, including wheels, shafts, bearings, drive motor and gearbox will be installed on the existing <br />bridge. <br />h. Aqua -Aerobic Systems will mechancially start up the filter, after the rebuild has been completed. <br />NOTES: <br />The Contractor shall provide for the following: <br />1. Offloading of equipment shipments. <br />2. Storage of the equipment shipments in a dry location, prior to installation. <br />3. A dumpster and disposal of waste generated during the filter rebuild process. <br />The Customer shall provide for the following: <br />6306 N_ Alpine Rd. Loves Park, IL 61111-7655 p 815.654.2501 f 815.654.2508 www.aqua-aerobic.com 208 <br />Copyright 2020, Aqua -Aerobic Systems, Inc Printed: December 8, 2020 Page 1 of 5 <br />