Laserfiche WebLink
enable installation of new plumbing vent pipe extensions and completion <br />of flashings. <br />b. Clean plumbing vent piping to ensure that joint surfaces are clean, dry, <br />and free from contamination including dirt, oils, grease, tar, wax, rust, and <br />other substances that may inhibit adhesive or sealant performance. <br />2. Installation <br />a. Insert end of plumbing vent pipe extension into existing plumbing vent pip- <br />ing. <br />i. Verify circumference of existing plumbing vent piping and plumb- <br />ing vent pipe extension is appropriate to achieve secure, rigid in- <br />stallation. <br />ii. Mark plumbing vent pipe extension at required height above fin- <br />ished roof surface level, and cut to required length. <br />iii. Apply adhesive or sealant to plumbing vent piping as appropriate <br />to existing pipe material and plumbing vent pipe extension, and <br />mate plumbing vent pipe extension to existing piping. Apply ade- <br />quate adhesive or sealant to achieve secure, rigid installation. <br />3.7 LIGHTWEIGHT CONCRETE FILL <br />A. Remove all loose, wet, and deteriorated existing lightweight concrete fill from repair area. <br />B. If fill is wet or deteriorated down to the steel form deck refer to Steel Deck Repair specifi- <br />cation section. <br />C. Mix lightweight concrete fill with water utilizing ratios, quantities, and methods recom- <br />mended by the manufacturer. <br />D. Slowly pour lightweight fill into repair area and screed off flush with surrounding existing <br />fill. <br />E. Mechanical attachment of base sheet may begin after the new fill has set. <br />3.8 STEEL PLATE INSTALLATION <br />A. Mechanically attach deck repair plates to concrete deck with approved fasteners 6" on <br />3.9 SCUPPER INSTALLATION <br />A. Locate bottom of overflow scupper 2 inches above surface of the roof system adjacent to <br />the nearest roof drain (excluding sump). <br />B. Remove existing masonry and store for reuse if in good condition. Reinstall masonry units <br />to extent possible. Provide new brick or concrete masonry units to match existing. <br />C. Extend opening through entire thickness of parapet. Take precautions to avoid damaging <br />adjacent wall surfaces. <br />D. Provide finished openings as indicated. <br />E. Install veneer materials of same type, size and finish to match existing. Set units in full <br />beds of mortar to match adjacent joints in thickness. Tool joints to match. <br />F. Repair exterior finish to match adjacent surfaces. <br />IRC -1838 Indian River County - <br />Main Library <br />Roof Replacement 0701 50-5 Preparation for Reroofing (Revision 1) <br />