Laserfiche WebLink
3.4 <br />limited to reinstallation of roof system, installation of additional tapered insulation and/or <br />installation of additional base plies. <br />CLEANING <br />A. Remove all debris and excess material from the roof area. Pick-up all loose fasteners and <br />sheet metal scraps. <br />B. The Contractor shall clean off/remove excess adhesive, sealant, stains and residue on the <br />membrane and flashing surfaces. <br />IRC -1838 Indian River County <br />Main Library <br />Roof Replacement <br />END OF SECTION 07 52 16 <br />07 52 16-10 Modified Bitumen Roofing (Revision 1) <br />