Laserfiche WebLink
IRC -1838 Bid No. 2020029 <br />AGREEMENT <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Atlantic Roofing II of Vero Beach, Inc. <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />PROJECT DESCRIPTION: The project involves the replacement of the low slope roofing <br />assemblies of the Indian River County Main Library, located at 1600 21St Street, Vero Beach, FL <br />32960. The project includes the removal and disposal of the existing roof system (approximately <br />29,397 square feet) including flashings and sheet metal down to the existing light weight <br />insulating concrete deck. The existing roof system will be replaced with a new modified bitumen <br />roofing assembly to provide a complete, watertight, 20 -year warrantable roof system. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: INDIAN RIVER COUNTY MAIN LIBRARY ROOF REPLACEMENT (IRC -1338) <br />Bid Number: 2020029 <br />Project Address: 1600.215T STREET VERO BEACH, FL. 32960 <br />ARTICLE 3 CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 90 calendar day after the date when the <br />Contract Times commence to run as provided in the Notice to Proceed and completed and ready <br />for final payment in accordance with the Notice to Proceed on or before the 120 calendar day after <br />the date when the Contract Times commence to run. <br />3.03 Liquidated Damages <br />