My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-015A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-015A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:19:35 PM
Creation date
3/15/2021 10:25:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/03/2020
Control Number
2020-015A
Agenda Item Number
Signed by County Administrator
Entity Name
Donadio & Associates, Architects, P.A
Subject
Architectural Services Work Order 002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P . ROKYSAL FOR THE wrmt[OlkDEMOLITION -AND UrDESIUMOPTI-18 COMMUNffy <br />DlsVE-'LOPME'NTT)J,PA-Wl'K4UNTBt-JILDINO "A" INDIAN RtVhft COUNTY ADMINISTRATION COMPLEX <br />pfise 2 <br />DE'SIGN-Dri-VELOPIVE, NT P-11ASt <br />Based on the approved'Sohetha ' ticDe8igii Documents -and py-adNstrrionts authorized by the <br />Owner -in f <br />, tb6 pt-ogearn's6hodifle ot.construotion budget, the Architect shall:preo6fc., jor approval <br />bythc.Own.er, Desigg D-evdldpinailtDoouments.cotisistitig'pf deawitigs And:oth.e.r dbounien.ts to <br />fix -and describe the sJz6.8ad'-ch9r6e(ec of the projoct.:As to ArchitdctW-41, MeolidnlcAl afid'Eleotri.oal <br />systems, materialsandsuch-other elements as. maybe appropr-100. <br />a CONSTIIUC.TIO.NDOCUMENTS P-KA-SFK <br />Based. on'tho approved Design Dr.Volopment Documents and any further adj.ustinentg .in. the <br />scope or quality of the project or in the consti-uction budget authotized by th6 Owner, the Architect <br />shall prepare, for approval by the Owner, Construction Documents -consisting of Drawings and <br />Speefficatiohs setting forth in detail the requirements for the construction of the Project. <br />BIDDING AND NEGOTIATION MUSE <br />The Architect, followi4gthe Owner's -approval of theConstructionDocuments shall-0sist'the <br />Owner-ln the review of 13 ids- fbr:Cbns&uotion,.:attendaaoe at.11re-WdMeeting, clarifications <br />of jK-FlI q and issuance of addenda. <br />• CONSTRUCTION ADMINISTRATION PHASE OF T ' HE, CONTRACT <br />The Architect's responsibility to provide Basic Serviow(failhe Construction Phase under. this <br />Agreement oomiliences with. the award of the contract for construction and tenninates-at the <br />is�wapce.to the OWjieP- * Of -d , 10 final Certificate for'Payment or 60*days after the date of Substantial <br />COM of the'first. <br />Wo�k,.w.hiehe�yer cop es. <br />The Architect shall provide, periodic a ma*Aun of . eight (8) periodic Site Obtervatio.ris, Review <br />.of Cbntractor's Appljcjktjo6sToj- payrne r <br />Payment, Contractors ieqyes to ihfonytation -g.ridlor -clarifications, <br />Shop. Drawing Reviews, Review of (Mange, 0i&r and ([eQisI'ohs:on.any claims or'disputes, <br />-Purf6h.U.St W . alk-711111:w.lih. Client and ContrActor-io. 4terthine, general confolltnity with apprdft4 <br />plans -and �speoificati OHS. <br />H) MjQCHANICAL, ELECTRICAL AND PLUMBING <br />a) Coordinate with Ctiont to establish desigrigriteria for heating, ventilation and air <br />conditioning (1-IVAC), <br />VAQ, elwtttcal-aftd'plumbhig. <br />b) construction documents and spe.offloitions for IIVAC, elecUlcalAnd, p1tunbing, <br />which h1clude, but not liruftedto: Floor. Plans., sch6dules, rhiersy p4fie*hs,;detRflk ete.. <br />c) -Cuoi-dfiiap h.h.d conform WUh. appljdale Railding:.Codeg aad.Building Departments. <br />Three (3) sets of signed and seakd-peiinit dodomaints.. Additional sets to be billed <br />as reiiiibursables, <br />0) State of Florida. energy cales, <br />
The URL can be used to link to this page
Your browser does not support the video tag.