Laserfiche WebLink
Attachment B <br />Page 24 of 27 <br />Construction engineering and inspection forces will be required of the Consultant while <br />the Contractor is working. If Contractor operations are substantially reduced or suspended, <br />the Consultant will reduce its staff appropriately. <br />In the event that the suspension of Contractor operations requires the removal of Consultant <br />forces from the project, the Consultant will be allowed ten (10) days maximum to <br />demobilize, relocate, or terminate such forces. <br />11.0 QUALITY ASSURANCE (OA) PROGRAM: <br />11.1 Quality Assurance Plan: <br />Within thirty (30) days after receiving award of an Agreement, furnish a QA Plan to the <br />Construction Project Manager. The QA Plan shall detail the procedures, evaluation criteria, <br />and instructions of the Consultant's organization for providing services pursuant to this <br />Agreement. Unless specifically waived, no payment shall be made until Indian River <br />County approves the Consultant QA Plan. <br />Significant changes to the work requirements may require the Consultant to revise the QA <br />Plan. It shall be the responsibility of the Consultant to keep the plan current with the work <br />requirements. The Plan shall include, but not be limited to, the following areas: <br />A. Organization: <br />A description is required of the Consultant QA Organization and its functional <br />relationship to the part of the organization performing the work under the <br />Agreement. The authority, responsibilities and autonomy of the QA organization <br />shall be detailed as well as the names and qualifications of personnel in the quality <br />control organization. <br />B. Ouality Assurance Reviews: <br />Detail the methods used to monitor and achieve organization compliance with <br />Agreement requirements for services and products. <br />C. Ouality Assurance Records: <br />Outline the types of records which will be generated and maintained during the <br />execution of the QA program. <br />D. Control of Subconsultants and Vendors: <br />Detail the methods used to control subconsultant and vendor quality. <br />E. Ouality Assurance Certification: <br />An officer of the Consultant firm shall certify that the inspection and <br />documentation was done in accordance with FDOT specifications, plans, standard <br />indexes, and Indian River County procedures. <br />Rev. 2/11/2021 <br />