My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-038
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 12:19:04 PM
Creation date
3/18/2021 12:18:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/16/2021
Control Number
2021-038
Agenda Item Number
8.I.
Entity Name
Donadio & Associates, Architects, P.A
Subject
Architectural Services Amendment No 1 to Work Order 002 for
Area
Community Development/Building Division Renovation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL FOR T'HE INTER101t DEMOLITCON AND RFZ U-MUKOPTI-113 COMMUNITY <br />Db'VELOPME'NTDEPAwrmENTB(IELDINO.I*A" tNDrAN RIVlElk COUNTY ADMINISTRATION COMPLEX <br />Decchibor 18:; 2019 <br />Pop 2 <br />• DESIGN DEVELOPMENT PITASt, <br />Dosed on the ap.proved.SoheinaticDesign Docutnents..and.aTty-adiustiTionts eiuthormed by the <br />Owner in <br />..tho, ptograin'sdliddule orconsti-uction budget, *the-Arahitoot. shall:preparc., for approval <br />4y -the Owner, Design DevdIcipment.Documents consisti ' i ' ig-pf drawings atid:q , th, , e , r c1bowhen.ts to <br />Fix. and describe the slze-aad,-ch6ra:C(ev of the proi.oct.As to ArchitbotUral, MeotidnicAl arid'Eleettioal, <br />systems, materials and sucli-othex elements -as.nigy be appropriate. <br />• CONSTIlUCTIONDOCUMENTS P -HM- E <br />Based.Qn , tho approved Design Development Documents and any furtlier adjustidents in. the <br />scope or quality of the project or in the construction budget autho6zed, by the Owner, the Architect <br />shall prepare, for approval by th.c Owner, Constractibn Documents -consisting of Drawings and <br />Specificatiohi; setting forth in detail tlic. requirements for the construction of the Project. <br />BIDDING AND NEGOTIATION PHASE <br />Fhe Architect, -following the Owner's -approval of the Construction Documents shall aissist'die <br />'Ownp 'in the review of Bids for: Construction,.: attendance. at.1re-Bid.10,ecting, clarifications <br />of RFFs and* issuance 6-Faddenda. <br />• CONSTRUCTION ADMINISTRATION PHASE OF THRCONMUCTION CONTRACT <br />The Architect's responsibility to provide Basic ServiGesfor rho Construction Phase under. this <br />Agreement oommences with the award of the contract f6r construction and terniinates- at the <br />isgualice.to the -Ownerof-the. filial Certificate -.for'Paymerit or-'60,days after the date of Substantial <br />Com Woik,w.flicheyer comt*'r <br />.Pletioll ofth. <br />The Are fitectsliall ptoVil1q.-periodip a inaxi;tuum ofeight (g.) periodic Site Observations, Review <br />.of Cbntractor's,App.'Iichtiofis-foi, Payment, Contractors request.tor ififbi-matiorl gad/or-clarifications, <br />Sliop. Drawing Reviews, Review of (Mange Order and (fmisions::onany clatnis or disp0tos, <br />Nadh-List Walk -Thio ;with. Client and Contractor-io. deterniine general oonfolinit7. with appro-' <br />plans and.-specii5eafiblis. <br />jqEgCHANICA1E LECTRICAL AND PLUMBING <br />, <br />a) Coordinate with Client to establish design.criteria for heating, ventilation and ail - <br />conditioning (HVAC), ekottleal-and 'pluinbing. <br />b) Construction documents and specifications for MVAC, elect&al.And,plujfib.ing, <br />N41ilcb include but not linifted,to: Floor Plans, schedules, ete.. <br />a) Coordinate tdid coftfoffn with applicable Hililding.-Codos and. Building Departments. <br />. . to .. - .. . . ... . . . . <br />-Three (3) sets of signed and -sealed. pej4hit dodumeots.. Additi0oalsets tobobilled <br />as refinbursables, <br />e) State, of Florida. energy cales. <br />
The URL can be used to link to this page
Your browser does not support the video tag.