Laserfiche WebLink
2.2 Review of recorded caracara nests and their history of use in the area <br />and preliminary inspection for potential nesting trees / palm trees for <br />nests and observations of utilization by individuals. <br />2.3 Other listed species that are observed onsite or could utilize the site will <br />also be addressed in the report. <br />2.4 The 38.0 acre site will also be surveyed for any State and Federal <br />regulatory wetlands and located (approximately) on an aerial. <br />NOTE: Due to large size of the property (38.0 acres) and the density of <br />vegetation growth onsite (unmaintained for years), the above <br />referenced field surveys will require approximately 3.5 days to <br />complete. <br />TOTAL COST AS OUTLINE ABOVE FOR TASKS I AND II above.... $8,955.00 <br />TASK III <br />3.0 MODIFIED PHASE II SOIL & GROUNDWATER SAMPLING & ANALYSES <br />(Lump Sum $10,820.00) <br />Due to the historic past usage of the subject site (i.e. citrus grove), it is <br />reasonable to assume that pesticides and herbicides were used onsite for years, <br />including potentially harmful products. It is our recommendation to install 8 PVC <br />shallow groundwater wells (similar to the ones we did on 45th Street in 2019) and <br />sample the soil and groundwater at these 8 locations. <br />3.1 Installation of eight temporary monitoring wells. <br />3.2 Collection and analysis of groundwater samples for Chlorinated <br />Pesticides and Arsenic. <br />3.3 Collection and analysis of soils samples for Chlorinated Pesticides and <br />Arsenic. <br />3.4 Preparation of a report. <br />Duplicate groundwater samples for the Arsenic will be collected to compare <br />filtered and unfiltered analyses if this compound is present at concentrations in <br />excess of state standards. <br />TOTAL COST FOR THE ABOVE TASK III ABOVE .................. $10,820.00 <br />TOTAL COST FOR TASKS I, II, AND III ABOVE .................... $19,775.00 <br />NOTE: TASK III — Soil and groundwater analyses can be separated from <br />this proposal and completed at a later date if needed. <br />Page 3 of 5 <br />Filipiak / GKE / Proposal <br />3-3-21 <br />