My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/16/2021
CBCC
>
Meetings
>
2020's
>
2021
>
02/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 3:24:48 PM
Creation date
4/1/2021 3:22:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/16/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />February 5, 2021 <br />Quintin Bergman, M.S. <br />Sea Turtle Environmental Specialist <br />Indian River County Public Works Coastal Division <br />180127th Street, Vero Beach, FL 32960 <br />Subject: Indian River County, FL <br />Sector 3 - 2018006 - Work Order #9 <br />2021 Environmental Monitoring <br />Dear Quintin: <br />This proposal outlines a scope of work for Aptim Environmental & Infrastructure, LLC (APTIM), to provide <br />professional services to Indian River County (the County) in support of the Sector 3 Beach and Dune <br />Renourishment Project. The scope of work described herein is to support the County with the following items: <br />1. To conduct the 2021 Nearshore Hardbottom Biological Monitoring <br />2. To conduct the 2021 Post -Construction Sea Turtle Monitoring <br />The tasks to perform this work are listed below and described on the following pages. A breakdown of the hours <br />and expenses to develop the cost is attached. The scope and fee were developed following the provisions of the <br />Professional Services Agreement between Indian River County and APTIM, dated January 9, 2018, to provide <br />engineering and biological support services for the Sector 3 (Wabasso Beach) Beach and Dune Renourishment <br />Project (RFQ#2018006). <br />1. Task 1: Pre -Construction Nearshore Hardbottom Biological Monitoring <br />The Sector 3 2021 nearshore hardbottom biological monitoring will be managed and conducted by APTIM, and <br />conducted by APTIM's approved subconsultant, Coastal Engineering Protection LLC (CPE). <br />The Biological Monitoring Plan developed for the Sector 3 project during permitting will require pre- and post - <br />construction biological monitoring adjacent to the project area to monitor for potential secondary impacts to <br />hearshore natural hardbottom. The scope for this task is based on the FDEP-approved Biological Monitoring Plan <br />(0285993 -009 -JC). The nearshore hardbottom monitoring shall include: <br />• Hardbottom edge mapping <br />• Monitoring permanent transects <br />Task 1: Scope of Work <br />1) Hardbottom Edge Mapping: <br />APTIM shall map the position of the nearshore hardbottom edge for the entire Sector 3 project area, including <br />1000 feet north (updrift) and 3000 feet south (downdrift) of the project area (R-19 to R-58) for a length of <br />approximately 7.3 miles. A buoy with a Differential Global Positioning System (DGPS) antenna linked to a <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.