My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-053
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 2:02:23 PM
Creation date
4/22/2021 1:59:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/13/2021
Control Number
2021-053
Agenda Item Number
8.B.
Entity Name
Florida Department of Transportation (FDOT)
CEI
Subject
Construction (Milling and Resurfacing) and Construction Engineering Inspection (CEI)
Services for 6th Ave from SR-5/US 1 to 21st Street
Area
6 th Ave from SR-5/US 1 to 21st Street
Document Relationships
2021-028
(Agenda)
Path:
\Resolutions\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525410-60 <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />102020 <br />limited to, the applicable provisions of the Manual of Uniform Traffic Control Devices (MUTCD) and the <br />AASHTO Policy on Geometric Design of Streets and Highways. If any portion of the Project will be located <br />on, under, or over any Department -owned right-of-way, the Department shall review the Project's design <br />plans for compliance with all applicable standards of the Department, as provided in Exhibit "O", Terms <br />and Conditions of Construction, which is attached to and incorporated into this Agreement. <br />f. The Recipient shall adhere to the Department's Conflict of Interest Procedure (FDOT Topic No. 375-030- <br />006). <br />g. The Recipient will provide copies of the final design plans and specifications and final bid documents to the <br />Department's Construction Project Manager prior to commencing construction of the Project. The <br />Department will specify the number of copies required and the required format. <br />h. The Recipient shall require the Recipient's contractor to post a payment and performance bond in <br />accordance with applicable law. <br />i. The Recipient shall be responsible to ensure that the construction work under this Agreement is performed <br />in accordance with the approved construction documents, and that it will meet all applicable Recipient and <br />Department standards. <br />j. Upon completion of the work authorized by this Agreement, the Recipient shall notify the Department in <br />writing of the completion of construction of the Project; and for all design work that originally required <br />certification by a Professional Engineer, this notification shall contain an Engineers Certification of <br />Compliance, signed and sealed by a Professional Engineer, the form of which is attached hereto and <br />incorporated herein as Exhibit "C", Engineers Certification of Completion. The certification shall state <br />that work has been completed in compliance with the Project construction plans and specifications. If any <br />deviations are found from the approved plans, the certification shall include a list of all deviations along with <br />an explanation that justifies the reason to accept each deviation. <br />k. The Recipient shall provide the Department with as -built plans of any portions of the Project funded through <br />the Agreement prior to final inspection. <br />11. Maintenance Obligations: In the event the Project includes construction then the following provisions are <br />incorporated into this Agreement: <br />a. The Recipient agrees to maintain any portion of the Project not located on the State Highway System <br />constructed under this Agreement for its useful life. If the Recipient constructs any improvement on <br />Department right-of-way, the Recipient <br />❑ shall <br />® shall not <br />maintain the improvements located on the Department right-of-way made for their useful life. If the Recipient <br />is required to maintain Project improvements located on the Department right-of-way beyond final <br />acceptance, then Recipient shall, prior to any disbursement of the State funding provided under this <br />Agreement, also execute a Maintenance Memorandum of Agreement in a form that is acceptable to the <br />Department. The Recipient has agreed to the foregoing by resolution, and such resolution is attached and <br />incorporated into this Agreement as Exhibit "D". This provision will survive termination of this Agreement. <br />12. State Single Audit: The administration of resources awarded through the Department to the Recipient by this <br />Agreement may be subject to audits and/or monitoring by the Department. The following requirements do not limit <br />the authority of the Department to conduct or arrange for the conduct of additional audits or evaluations of state <br />financial assistance or limit the authority of any state agency inspector general, the Auditor General, or any other <br />state official. The Recipient shall comply with all audit and. audit reporting requirements as specified below. <br />a. In addition to reviews of audits conducted in accordance with Section 215.97; Florida Statutes, monitoring <br />procedures to monitor the Recipient's use of state financial assistance may include but not be limited to on- <br />site visits by Department staff and/or other procedures including, reviewing any required performance and <br />Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.