Laserfiche WebLink
Amendment 1 to Work Order 33 <br />Kimley-Horn and Associates, Inc. <br />EXHIBIT A— SCOPE OF WORK <br />The ENGINEER will extend the design 43,d Avenue as a 3 -lane rural roadway section connecting <br />to the existing 3 -lane section to immediately north of 5th Street SW. This will extend the <br />proposed roadway reconstruction limits approximately 600 linear feet beyond previously <br />contemplated project limits. This amendment will provide for the supplemental topographic <br />design survey and roadway design efforts to complete. <br />EXHIBIT B— FEE SCHEDULE <br />The basic compensation mutually agreed upon by the ENGINEER and the COUNTY is as follows: <br />Lump Sum Components <br />Task Labor Fee <br />Task 1—Supplemental Topographic Design Survey $ 3,200 <br />Task 2 — Supplemental Roadway Analysis and Plans $7,605 <br />Amendment Total $ 10,805 <br />EXHIBIT C —TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately five (5) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Interim Submittal (80% Design Drawings) 3 months following NTP <br />Final Submittal (100% Design Drawings) 5 months following NTP <br />