Laserfiche WebLink
EXHIBIT "A" <br />MJMASTELLER & MOLER, INC. <br />CIVIL ENGINEERS <br />RESERVE AT GRAND HARBOR (PHASE 1) <br />- CERTIFIED COST ESTIMATE <br />ATRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />2/8/2021 <br />Description <br />Quantity <br />Unit <br />Unit Price <br />TOTAL <br />Mobilization <br />1 <br />LS <br />$3,500.00 <br />$3,500.00 <br />1.0" SP 9.5 - 2nd Lift (Grand Harbor Reserve Sq.) <br />3,321 <br />SY <br />$9.00 <br />$29,889.00 <br />Mill Existing Asphalt (1.5") <br />9,579 <br />SY <br />$2.50 <br />$23,947.50 <br />Overlay w/ 1.5" SP 9.5 Asphalt <br />9,579 <br />SY <br />$11.00 <br />$105,369.00 <br />Restripe Pavement <br />1 <br />LS <br />$4,000.00 <br />$4,000.00 <br />Reset PCP's <br />1 J <br />LS <br />$3,000.00 <br />$3,000.00 <br />TOTAL <br />$169,705.50 <br />ISurety Amount (125%) $212,131.88 <br />CERTIFICATE OF COST ESTIMATE <br />I, Stephen E. Moler, a Florida registered engineering, License No. 33193, do hereby certify to Indian River County that this <br />cost estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the <br />total cost estimate is true and accurate to the best of my knowledge. This estimate has been prepared, in part, to induce <br />approval by the County of a final plat for the Reserve at Grand Harbor Phase 1 project, and for the purpose of establishing <br />proper surety arsons a'j��ooigted therewith. <br />Q O i <br />ENSFWA <br />co <br />,,gy�pp 93 's <br />• ER <br />,-A •; STATE OF ?, <br />Stephen �„ •ler,, .� 1+C �NGiINEEFiINI2 <br />Vice Presid�FgS •��v��,•'`DIVISI N 'Z /2� <br />'��. �O!a1 �.,t� Accepted / <br />��flil07:li1l111 �� <br />!nsufficient <br />File#1357 1655 27th Street, Suite 2 Page 1 of 1 <br />ADNIMConstmctionWalntenance Bond Estimate Vero Beach, Florida 32960 <br />(PerformanceBond_FinalLiftAsphalt_Extension_21-0208.xlsx) (772) 567-5300 <br />