My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-060
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 4:18:25 PM
Creation date
4/26/2021 3:14:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/13/2021
Control Number
2021-060
Agenda Item Number
15.B.3.
Entity Name
Summit Construction of Vero Beach
Subject
Work Change Directive No. 001 to add additional concrete footing &
thickened edge of concrete pad
Area
1325 74th Avenue SW ; IRC Landfill
Project Number
2020050 Concrete Pad
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />m0 <br />Va <br />EV <br />Na <br />0!a <br />� J <br />a <br />m <br />0 IRC-SWDD Project #2020050 <br />All Rights Reserved December 2020 <br />WORK CHANGE DIRECTIVE <br />PROJECT: #2020050 Concrete Pad DATE OF ISSUANCE: 12/21/20 <br />OWNER: <br />IRC o Solid Waste Disposal District <br />1325 74`p Avenue SW <br />Vero Beach, FL, 32965 <br />CONTRACTOR: Summit Construction of Vero Beach OWNER'S Project No.: 2020050 <br />ENGINEER: R.T. Jones, BSCE- SWDD <br />CONTRACT FOR: Concrete Pad ENGINEEWs FrojectNo.: 2020050 <br />You are directed to proceed with the following change(s): <br />Description: Add additional concrete footing & thickened edge ner plan from Kimiev darn dated 10/30/20 <br />Purpose of Work Directive Change; •IQ comply with Florida Bg Wing Code Chapter 16 <br />Attachment(s) (list documents supporting change): Elorida 13milding Code Chanter 16 Structural Desi <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, any claim for a <br />Change Order based thereon will involve one of the following; methods of determining the effect of the <br />change(s). <br />Method of determining change in Contract Price: <br />Time: <br />[X] Time and Materials <br />[ J Unit Prices <br />[ ] Cost plus fixed fee <br />Estimated increase (decrease) in Contract Price <br />$ 14.839.00 . If the <br />change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in Contract <br />[ ] Contractor's records <br />[X] Engineer's records <br />[ ] Other <br />Estimated increase (decrease) in Contract Time <br />None days. If the change involves an <br />increase, the estimated time is not to be exceed <br />without further authorization, <br />Once the Work covered by the directive is completed or final cost and time determined, CONTRACTOR <br />should submit documentation for inclusion in a change Order. �- <br />„ ."�"�ON' <br />0 h_ 1 MIS `"•,.. <br />c, <br />THIS IS A DIRECTIVE TO PROCE 'S*i'C • t1 O �iE THAT MAY AFFECT THE CONTRACTS <br />PRICE OR THE CONTRACT TIMIYC��GE IF ANY, SHOULD BE CONSIDERED U <br />.: sir <br />DUrA UTT v s n <br />RECOMMENDED: <br />By; Ronnie T. Jones. BSCE - S WDI1� •. <br />ENGINEER <br />Date: 12/21/20 •�,.. <br />ACCEPT BY NT <br />,ACT <br />:, <br />w3 . G <br />PROJECT MANAGER <br />Date: 12/21/20 <br />OWNER <br />Pa <br />0 <br />figur- <br />{1Q <br />d'� <br />
The URL can be used to link to this page
Your browser does not support the video tag.