My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 12:28:50 PM
Creation date
4/27/2021 10:38:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida, Inc.
Subject
Contract documuments for Round Island Park Emergency and Heavy Equipment Beach Access
Project Number
IRC-1927
Bid Number
2021025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pay request for all remaining retainage except as otherwise set forth in this <br />Agreement; and 3) any and all items that require correction under this Agreement <br />and that are identified after the preparation of the Statutory List remain the <br />obligation of the Contractor to complete to the Owner's satisfaction under this <br />Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br />acknowledges and agrees that it will diligently proceed to complete all items on <br />the Statutory List and schedule a final walk-through in anticipation of final <br />completion on the Project." <br />SC -14.04B Add the following new paragraph immediately after paragraph GC 14.048: <br />C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will <br />deliver to Owner and Contractor a written recommendation as to division of responsibilities <br />pending final payment between Owner and Contractor with respect to security, operation, <br />safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and <br />guarantees <br />SC -14.07 Final Payment <br />SC -14.07.C.1. Delete paragraph GC -14.07.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the " Local <br />Government Prompt Payment Act" , Florida Statutes section 218.70, et. seq. <br />SC -15.01 OWNER May Suspend Work <br />SC -15.01.A Delete the last sentence in paragraph GC -15.01.A and insert the following in its <br />place: <br />CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br />such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br />10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br />CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- <br />nomic loss arising out of or resulting from such Work suspension. <br />SC -15.02 OWNER May Terminate For Cause <br />SC -15.02.A.5 and SC -15.02.A.6 Add the following new paragraphs immediately after <br />paragraph GC -15.02.A.4: <br />5. CONTRACTOR's violation of Section 02225 — "Erosion Control and Treatment of <br />Dewatering Water From the Construction Site." . <br />6. CONTRACTOR's failure to make payment to Subcontractors or Suppliers for <br />materials or labor in accordance with the respective agreements between the <br />CONTRACTOR and the Subcontractors or Suppliers. <br />00800-10 <br />00800 - Supplementary Conditions <br />00800 1 OF:\Public Works\ENGINEERING DIVISION PROJECTS\1927 Round Island Beach Access\1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - <br />Supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.