My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 12:28:50 PM
Creation date
4/27/2021 10:38:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida, Inc.
Subject
Contract documuments for Round Island Park Emergency and Heavy Equipment Beach Access
Project Number
IRC-1927
Bid Number
2021025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />information available, but is not guaranteed to be correct or complete. The <br />existing utilities shown on the Contract Drawings are located according to <br />the information available to the ENGINEER at the time the Drawings were <br />prepared and have not been independently verified by the OWNER or the <br />ENGINEER. Guarantee is not made that all existing underground utilities <br />are shown or that the locations of those shown are accurate. The locations <br />shown are for bidding purposes only. Finding the actual location of any <br />existing utilities is the CONTRACTOR's responsibility and shall be done <br />before it commences any work in the vicinity. Furthermore, the <br />CONTRACTOR shall be fully responsible for any and all damages, which <br />might be occasioned by the CONTRACTOR's failure to exactly locate and <br />preserve any and all underground utilities. The OWNER or ENGINEER will <br />assume no liability for any damages sustained or costs incurred because of <br />the CONTRACTOR's operations in the vicinity of existing utilities or <br />structures, nor for temporary bracing and shoring of same. If it is necessary <br />to shore, brace, or swing a utility, contact the utility company or department <br />affected and obtain their permission regarding the method to use for such <br />work. <br />3. Contact the various utility companies which may have buried or aerial <br />utilities within or near the construction area before commencing work. <br />Provide 48 hours minimum notice to all utility companies prior to beginning <br />construction. <br />4. Schedule and execute all work involving existing utilities in order to minimize <br />necessary interruption of services. Whenever such interruption is necessary <br />for completion of the work, notify the ENGINEER and the appropriate utility <br />at least 48 hours in advance. Perform all work to repair/restore utility <br />service to the satisfaction of the appropriate utility. Include all costs related <br />to service maintenance, interruption, and restoration in the appropriate line <br />item in the Contract. <br />5. Where it is necessary to temporarily interrupt house or business services, <br />the CONTRACTOR shall notify the owner or occupant, both before the <br />interruption (24-hour minimum), and again immediately before service is <br />resumed. Before disconnecting and pipes or cables, the CONTRACTOR <br />shall obtain permission from their owner, or shall make suitable <br />arrangement for their disconnection by their owner. <br />6. Explore ahead of trenching and excavation work and uncover all obstructing <br />underground structures sufficiently to determine their location, to prevent <br />damage to them and to prevent interruption of the services which such <br />structures provide. If CONTRACTOR damages an underground structure, <br />restore it to original condition at CONTRACTOR's expense. <br />7. Necessary changes in the location of the Work may be made by <br />ENGINEER, to avoid unanticipated underground structures. <br />01541-3 F:\Public Works\ENGINEERING DIVISION <br />PROJECTS\1927 Round Island Beach Access\1 -Ad min\Bids\Bid Documents\Master Contract Documents\01541 - Protection of <br />Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.