My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 12:28:50 PM
Creation date
4/27/2021 10:38:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida, Inc.
Subject
Contract documuments for Round Island Park Emergency and Heavy Equipment Beach Access
Project Number
IRC-1927
Bid Number
2021025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. In addition to these Specifications, comply with Chapter 4 - "Best Management <br />Practices for Erosion and Sedimentation Control" and Chapter 5 — "Best <br />Management Practices for Dewatering" of the Florida Erosion and Sediment Control <br />Inspector's Manual. In the event of a conflict between the referenced chapters and <br />these Specifications, the more stringent requirement shall prevail. <br />F. Submit to SJRWMD a "Notice to District of Dewatering Activity" (SJRWMD Form No. <br />40C-2.900(12)) prior to commencement of dewatering in accordance with F.A.C. <br />40C-2.042(9). Provide a copy of the Notice to Indian River County. <br />1.2 PERMITS <br />A. The OWNER has obtained certain permits for this project and they are listed in <br />paragraph 6.08.13 of the EJCDC Standard General Conditions of the Construction <br />Contract (General Conditions). Per paragraph 6.08.0 of the General Conditions, <br />apply for and obtain all other required federal, state, and local permits, licenses, <br />sampling, and tests. <br />B. Provide copies of all approved permits to the OWNER and ENGINEER and comply <br />with all conditions contained in all permits at no extra cost to the OWNER. If there is <br />a conflict between any permit requirement and these Specifications or requirements <br />between permits, the more stringent specification or requirement shall govern. <br />C. Pay for all required water quality sampling and laboratory tests. <br />1.3 GENERAL <br />A. Do not begin any other construction work until the pollution control and treatment <br />system has been constructed in accordance with approved plans, permits, and <br />these Specifications; and the installed system has been examined by the OWNER <br />for compliance. <br />B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br />treatment system and may take effluent samples for analysis by a testing laboratory <br />selected and paid for by the OWNER. If at any time, the OWNER or ENGINEER <br />determines that the pollution control and treatment system is not in compliance with <br />the approved system, the OWNER or ENGINEER will shut the portion of the project <br />down that is not in compliance, and it shall remain shut -down until the pollution <br />control and treatment system is properly constructed or repaired, and complies with <br />the approved pollution control and treatment system plans, specifications, contract <br />documents, and permits. <br />C. Schedule construction to minimize erosion and stormwater runoff from the <br />construction site. Implement erosion control measures on disturbed areas as soon <br />as practicable in portions of the site where construction activities have temporarily or <br />permanently ceased, but in no case more than 7 days after the construction activity <br />in that portion of the site has temporarily or permanently ceased. In addition to other <br />temporary erosion control measures that may be implemented, application of <br />polyacrylamide is required on all such disturbed areas within 7 days after the <br />01025-5 Technical Specifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.