Laserfiche WebLink
by the Engineer. The excavated materials shall be removed from the job site and <br />disposed in a location designated or approved by the Owner. Any culverts, <br />structures or any material excavated or removed from the project site under clearing <br />and grubbing deemed unsalvageable by the Engineer shall be disposed of in a legal <br />manner by the Contractor. Where required, suitable material as approved by the <br />Engineer shall then be backfilled and compacted to restore the original contour of <br />the ground. The fill material shall be backfilled and compacted in accordance with <br />Section 120 of these specifications. <br />H. No additional payment will be made, nor will additional work, or change orders be <br />authorized for work needed to remove, relocate, protect, or otherwise account for in <br />the construction of the work depicted in the plans, for any feature, or item that would <br />be apparent from a careful inspection of the site and review of the plans, even <br />though such feature or item is not specifically called out in the plans. It is therefore <br />essential the contractor make such inspection and review. <br />I. The unit price bid for this item shall include the cost of all labor, tools, and <br />equipment necessary to excavate, remove, and dispose of those items as directed <br />by the Engineer and where designated on the Drawings. The cost of restoration <br />and backfill and compaction for the specific area of removal shall also be included <br />under this item. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0110 1 1 - Clearing & Grubbing — Per Lump Sum <br />SECTION 120 - EXCAVATION AND EMBANKMENT <br />A. Earthwork, including earthwork for drives outside the right-of-way limits, shall be <br />paid for as embankment. Cost shall include all work specified in this section and <br />Section 120 of the FDOT Standard Specifications for Road and Bridge Construction. <br />Such price and payment shall specifically include all cost of any roadway, lateral <br />ditch or canal, and final dressing operations. <br />B. Earthwork quantities shall be considered as in-place material with no shrinkage <br />or expansion factors. <br />C. Subsoil Excavation - Any excavation below the proposed bottom elevation of the <br />select fill, isolated swale bottom locations, isolated locations for pipe installations <br />and as approved by the engineer shall be paid for as subsoil excavation. <br />Approximately 2.0 ft of subsoil excavation is required in sublateral canals. Cost of <br />replacement embankment shall be included in cost of subsoil excavation. Contractor <br />shall coordinate with county representative prior to any subsoil excavation. <br />D. Embankment - General Requirements for Embankment Materials: The following <br />is added after the first paragraph of Subarticle 1,20-7.2: <br />01025-15 Technical Specifications <br />