8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br />following representations:
<br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the
<br />other related data identified in the Bidding Documents.
<br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
<br />general, local, and Site conditions that may affect cost, progress, and performance of
<br />the Work.
<br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws
<br />and Regulations that may affect cost, progress, and performance of the Work.
<br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of
<br />subsurface conditions at or contiguous to the Site and all drawings of physical
<br />conditions in or relating to existing :surface or subsurface structures at or contiguous to
<br />the Site (except Underground Facilities) which have been identified in the
<br />Supplementary Conditions as provided in paragraph 4.02 of the General Conditions
<br />and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the
<br />Site which have been identified in the Supplementary Conditions as provided in
<br />paragraph 4.06 of the General Conditions.
<br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for
<br />having done so) all additional or supplementary examinations, investigations,
<br />explorations, tests, studies, and data concerning conditions (surface, subsurface, and
<br />Underground Facilities) at or contiguous to the Site which may affect cost, progress, or
<br />performance of the Work or which relate to any aspect of the means, methods,
<br />techniques, sequences, and. procedures of construction to be employed by
<br />CONTRACTOR, including applying the specific means, methods, techniques,
<br />sequences, and procedures of construction, if any, expressly required by the Contract
<br />Documents to be employed by CONTRACTOR, and safety precautions and programs
<br />incident thereto
<br />F. CONTRACTOR does not consider that any further examinations, investigations,
<br />explorations, tests, studies, or data are necessary for the performance of the Work at
<br />the Contract Price, within the Contract Times, and in accordance with the other terms
<br />and conditions of the Contract Documents.
<br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER
<br />and others at the Site that relates to the Work as indicated in the Contract Documents.
<br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information
<br />and observations obtained from visits to the Site, reports and drawings identified in the
<br />Contract Documents, and all additional examinations, investigations, explorations,
<br />tests; studies, and data with the Contract Documents.
<br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities,
<br />or discrepancies that CONTRACTOR has discovered in the Contract Documents, and
<br />the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
<br />J. The Contract Documents are generally sufficient to indicate and convey understanding
<br />of all .terms and conditions for performance and furnishing of the Work.
<br />K. Contractor is registered with and will use the Department of Homeland Security's
<br />00520-5 00520 - Agreement (Public Works) REV 9-2020
<br />F:1Purchasing%Blds12020-2021 FY(2021000)12021025 Round Island Park Emergency and Heavy Equipment Beach Access100520 - Agreement (Pubilc Works) REV 9-
<br />2020.doc
<br />
|