Laserfiche WebLink
8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of <br />the Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws <br />and Regulations that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of <br />subsurface conditions at or contiguous to the Site and all drawings of physical <br />conditions in or relating to existing :surface or subsurface structures at or contiguous to <br />the Site (except Underground Facilities) which have been identified in the <br />Supplementary Conditions as provided in paragraph 4.02 of the General Conditions <br />and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the <br />Site which have been identified in the Supplementary Conditions as provided in <br />paragraph 4.06 of the General Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />having done so) all additional or supplementary examinations, investigations, <br />explorations, tests, studies, and data concerning conditions (surface, subsurface, and <br />Underground Facilities) at or contiguous to the Site which may affect cost, progress, or <br />performance of the Work or which relate to any aspect of the means, methods, <br />techniques, sequences, and. procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, <br />sequences, and procedures of construction, if any, expressly required by the Contract <br />Documents to be employed by CONTRACTOR, and safety precautions and programs <br />incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at <br />the Contract Price, within the Contract Times, and in accordance with the other terms <br />and conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER <br />and others at the Site that relates to the Work as indicated in the Contract Documents. <br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information <br />and observations obtained from visits to the Site, reports and drawings identified in the <br />Contract Documents, and all additional examinations, investigations, explorations, <br />tests; studies, and data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, <br />or discrepancies that CONTRACTOR has discovered in the Contract Documents, and <br />the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding <br />of all .terms and conditions for performance and furnishing of the Work. <br />K. Contractor is registered with and will use the Department of Homeland Security's <br />00520-5 00520 - Agreement (Public Works) REV 9-2020 <br />F:1Purchasing%Blds12020-2021 FY(2021000)12021025 Round Island Park Emergency and Heavy Equipment Beach Access100520 - Agreement (Pubilc Works) REV 9- <br />2020.doc <br />