My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 12:28:50 PM
Creation date
4/27/2021 10:38:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida, Inc.
Subject
Contract documuments for Round Island Park Emergency and Heavy Equipment Beach Access
Project Number
IRC-1927
Bid Number
2021025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: .20 <br />OWNER: Indian River County <br />CONTRACTOR - <br />CONTRACT FOR: ROUND ISLAND PARK EMERGENCY AND HEAVY EQUIPMENT BEACH <br />ACCESS <br />Project No.: IRC -1927 <br />OWNER's Bid No. 2021025 <br />Project Description: Construction of a shell material road to allow heavy equipment access <br />to the south County beaches to perform health and safety related activities and provide <br />construction access for beach and dune renourishment projects. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To <br />OWNER <br />And T <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within <br />calendar days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630-1 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1927 Round Island Beach Access\1-Admin\Bids\Bid Documents\Master Contract Documents\00630 -Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.