My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/09/2021
CBCC
>
Meetings
>
2020's
>
2021
>
03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 10:18:31 AM
Creation date
5/6/2021 10:12:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/09/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Perform startup of new ATS <br />4. Restore all impacted areas to their pre -construction or "as nevi' condition <br />5. Prepare request for substantial completion. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial <br />Completion. <br />(c) From 211 calendar days to 240 calendar days from the effective date of Notice <br />to Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />4. Demobilize. <br />3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute <br />Final Completion. <br />3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the work is not completed within <br />the times specified in Paragraph 3.1 above, plus any extensions thereof allowed in accordance <br />with Article 12 of the General Conditions. They also recognize the delays, expense and <br />difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the <br />work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and <br />CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) <br />CONTRACTOR shall pay OWNER four -hundred and fifty dollars ($450.00) for each day that <br />expires after the time specified in Paragraph 3.1 for Substantial Completion, if CONTRACTOR <br />shall neglect, refuse or fail to complete the remaining work within the Contract Time or any <br />proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER four -hundred <br />and fifty dollars ($450.00) for each day that expires after the time specified in Paragraphs 3.1 <br />and 3.2 for completion and readiness for final payment. <br />3.3.1 The CONTRACTOR and OWNER agree that OWNER is authorized to deduct <br />all or any portion of the above -stated liquidated damages due to the Owner from <br />payments due to the Contractor; or, in the alternative, all or any portion of the <br />above -stated liquidated damages may be collected from the Contractor or its <br />Surety or Sureties. These provisions for liquidated damages shall not prevent <br />the OWNER, in case of the CONTRACTOR's default, from terminating the <br />Contractor's right to proceed as provided in this AGREEMENT. <br />3.3.2 In addition to the above -stated liquidated damages, the CONTRACTOR shall be <br />responsible for reimbursing OWNER to third party consultants in administering <br />the Project beyond the Final Completion date specified in this Agreement, or <br />beyond an approved extension of time granted to CONTRACTOR, whichever <br />date is later. <br />00530-2 <br />