My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/09/2021
CBCC
>
Meetings
>
2020's
>
2021
>
03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 10:18:31 AM
Creation date
5/6/2021 10:12:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/09/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspect the pile driving installation. Complete the FDOT pile driving logs. <br />Observe the performance of any static or statnamic load tests and review the details <br />are implemented as planned. <br />Evaluate problems encountered during construction and coordinate with the DGE <br />and the Contractor to resolve such problems, including possible additional testing <br />and withdrawing the Pile Installation Plan. <br />3) Spread Footings: <br />Observe construction of spread footing foundations and verify that they are <br />founded at the required elevation and on the proper soil/rock material. <br />Verify the Construction Plan requirements and the applicable specifications are <br />followed throughout the spread footing construction. <br />Evaluate problems encountered during construction and coordinate with the DGE <br />and the Contractor to resolve such problems. <br />4) Auger Cast Piles for Sound Barrier Walls: <br />• Process and review the Auger Cast Pile Installation Plan in accordance with <br />CPAM. <br />• Schedule a pre -pile installation meeting to go over the auger cast pile installation <br />procedures. Make sure the Contractor's field superintendent, CEI's auger cast pile <br />inspectors and the DGE are invited. Prepare and distribute minutes to the attendees. <br />• Observe installation of demonstration pile and production piles. Submit the <br />demonstration pile records to the DGE. Work with the DGE to ensure that the letter <br />of acceptance or recommendations of the production pile installation is issued in <br />accordance with CPAM. <br />• Inspect and verify the requirements on the Construction Plans and applicable <br />specifications are followed throughout the auger cast pile installation. <br />• Cast cylinders for grout strength testing in accordance with the specifications <br />• Complete the FDOT auger cast pile field installation logs and forward them to the <br />DGE upon completion of the auger cast pile installation. <br />• Verify the quality control processes of the Auger Cast Pile Installation Plan are <br />followed during construction. <br />Examine the records and evaluate problems encountered during construction and <br />coordinate with the DGE and the Contractor to resolve such problems, including <br />possible withdrawing the Auger Cast Pile Installation Plan approval. <br />10.0 PERSONNEL: <br />10.1 General Requirements: <br />Provide prequalified personnel necessary to efficiently and effec <br />res onsibilities under this Agree ment. Method of compensation for <br />to this proiect shall be outlined in Attachment C Lump Sum.F— <br />Lump Sum costs shall be based upon the assumption of a standard work week as follows: <br />134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.