My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/09/2021
CBCC
>
Meetings
>
2020's
>
2021
>
03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 10:18:31 AM
Creation date
5/6/2021 10:12:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/09/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Preparation of FDEP Required Backup Documentation <br />MBV Engineering, Inc. will provide to FDEP and IRCU the following backup documents, maps, <br />and diagrams that are necessary to obtain the facility's required operating permit. <br />1. Process Flow Diagram <br />2. Site Plan <br />3. Location and Vicinity Maps <br />4. Facilities Description <br />5. Attendance at FDEP Meeting/Site Inspection Necessary to Close-out New Permit <br />MBV Engineering, Inc will attend the final walk-through meeting/inspection that is normally <br />necessary in order to finalize the permitting process. This on-site meeting is usually attended <br />by both FDEP and county personnel as well as a representative of the engineering firm in order <br />to discuss the details of the WWTF and what, if any, plant issues need to be addressed. <br />DELIVERABLES <br />The Consultant shall provide the COUNTY with the following: <br />• One (1) signed & sealed hard copy of the permit renewal package, including the revised operations <br />and maintenance performance report <br />EXHIBIT B - FEE SCHEDULE <br />The COUNTY agrees to pay and the Consultant agrees to accept for services rendered, pursuant to this <br />Agreement, fees inclusive of expenses in accordance with the following: <br />Task <br />Fee <br />Task 1: Site Inspection <br />$ 3,500 <br />Task 2: Tabulation of Plant Operating Data (supplied by IRC) <br />$ 3,000 <br />Task 3: Preparation & Submittal of FDEP Permit Renewal <br />$ 12,500 <br />Task 4: Preparation of the FDEP required backup documentation <br />$ 5,500 <br />Task.S: Attendance at FDEP Meeting / Site Inspection <br />Included <br />Work Authorization Total <br />$ 24,500 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, but may be required <br />depending on circumstances that may arise during the execution of. this project. Additional services <br />include, but may not be limited to the following: <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.