My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K. Contractor is registered with and will use the Department of Homeland Security's E -Verify <br />system (www.e-verify.gov) to confirm the employment eligibility of all newly hired employees <br />for the duration of this agreement, as required by Section 448.095, F.S. Contractor is also <br />responsible for obtaining proof of E -Verify registration for all subcontractors. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-10, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6, inclusive); <br />6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive); <br />7. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); <br />8. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the <br />Work (page 00634-1): <br />9. General Conditions (pages 00700-1 to 00700-37, inclusive); <br />10. Supplementary Conditions (pages 00800-i to 00800-12, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and Division 2 (Technical <br />Provisions); <br />12. Drawings consisting of the following: <br />• 6611 Avenue Phase 1A (North of 49th Street to North of 57th Street), <br />Sheets numbered 1 through 112, UT -1 through UT -3, S-1 through S-15 <br />• 66th Avenue Phase 1A Landscape Plan, Sheets (1 through 19), <br />• 66th Avenue Phase 1A Irrigation Plan, Sheets (1 through 19) <br />• 66th Avenue Phase 1A at 53rd Street Bridge Plans, Sheets (C-1 through B-23) <br />• 66th Avenue Phase 1 A over the North Relief Canal Bridge Plans, Sheets (B-1 <br />through B-29) <br />• 66th Avenue Phase 1A at 57th Street Bridge Plans, Sheets (C-1 through B-11) <br />• 66th Avenue Phase 1 B (57'1 Street to 69th Street), Sheets numbered 1 through <br />226 <br />• 66th Avenue Phase 1 B Landscape/Irrigation Plans, Sheets (LD -1 through LD -45) <br />• 66th Avenue Phase 1 B Signing and Marking Plans, Sheets (S-1 through S-24) <br />• 66th Avenue Phase 1 B Signalization Plans, Sheets (T-1 through T-14) <br />Agreement (Public Works) REV 04-07 - 00520 - 6 <br />H:\Bids\2020-2021 FY (2021000)\2021018 66th Ave Widening (49th St to 69th St)\IRC-1505 - Sample Agreement.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.