My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00550 - Notice to Proceed <br />Dated <br />TO: <br />(BIDDER) <br />ADDRESS: <br />Contract For: <br />66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />(Insert name of Contract as it appears in the Contract Documents) <br />Project No: IRC -1505 I <br />FM No: 436379-1-54-01 and 436379-1-54-02 <br />IRC Bid No. 2021018 , <br />You are notified that the Contract Times under the above contract will commence to run on <br />. By that date, you are to start performing your obligations under the Contract Documents. <br />The contract has allocated 720 calendar days for Substantial Completion of this project and 750 <br />calendar days for Final Completion. In accordance with Article 4 of the Agreement the date of <br />Substantial Completion is and the date of readiness for final payment is <br />CONTRACTOR shall not commence work under this Contract until he has obtained all insurance <br />required under Article 5 and such insurance has been delivered to the OWNER and approved by <br />the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence work on his ' <br />subcontract until all similar insurance required of the Subcontractor has been so obtained and <br />approved. All such insurance shall remain in effect until final payment and at all times thereafter <br />when CONTRACTOR may be correcting, removing or replacing defective Work in accordance <br />with Article 13. <br />Also, before you may start any Work at the Site, you must: <br />(add other requirements, if applicable) <br />INDIAN RIVER COUNTY <br />(OWNER) <br />i <br />By: <br />(AUTHORIZED SIGNATURE) <br />(TITLE) <br />Notice to Proceed REV 04-07 00550 - 1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505.66th Ave Widening_49th St to 69th St\1-Admin\13id Documents\Master Contract Documents\DIV 0_3_Contract <br />Forms.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.