My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC CONSTRUCTION BOND <br />Bond__ No. 107378188 <br />(enter bond number) <br />Halsey Engineering Travelers Casualty and Surety <br />BY THIS BOND, We Contractors; Inc. as Principal and Company of America a <br />corporation, as Surety, are bound to Indian. River County ,herein called Owner, in the sum of <br />$32,728,137,85 , for payment of which we bind ourselves, our heirs, personal representatives, <br />successors, and assigns, jointly and severally. <br />'THE CONDITION OF THIS BOND is that if Principal: <br />1. Performs the contract dated j1L, z-nzi , between Principal and Owner for construction of <br />(1) , the contract being made a part of this bond by reference, at the <br />times and in the manner prescribed in the contract; and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, <br />supplying Principal with labor, materials, or supplies, used directly or indirectly by Principal in the <br />prosecution of the work provided for in the contract; and <br />3. Pays Owner all losses, damages, expenses, costs, .and attorney's fees, including appellate <br />proceedings, that Owner sustains because of a default by Principal under the contract, and <br />4. Performs the guarantee of all work and materials furnished under the contract for the time <br />specified in the contract, then this bond is void; otherwise it remains in full force. <br />Any action instituted by a claimant under this bored for payment must be in accordance with the <br />notice and time limitation provisions in Section 255.05(2), Florida Statutes: <br />Any changes in or Under the contract documents and compliance or noncompliance with any <br />formalities connected with the contract or the changes does not affect Surety's obligation under <br />this bond. <br />DATED ON 01- Zazl Halley Engineering Contractors, Inc. <br />ame of f?fi ictpal) �Dl I <br />lailleY, Preside <br />By <br />(As,Attorne.yAn Fact) Charles J. 'Nielson <br />r J Travelers Casualty and Surety Company of America <br />c.,iari (Name of Surety) <br />(f) 56th Avenue Roadway Widening (49th Street to (39th Street) - Bid No. 2021018 <br />The provisions Haid limitations or Section 255.05 Florida Statutes. <br />including but not limited to the notice atud tiiatc Iimitatioils in <br />Scctians 255-05(l) and 255.05(110), ary mcorportted ice (his bond. <br />bN rricreaace. <br />Public construction Bond - 00610 - 3 <br />F "IC WmkMNGINEERING MOON PROgIcTstt6tl -055 Aye Wld�i INL"th SI to eft 54111.AdminlBidpbtumpnlalMefterCenlnet GOet&�xnlsSt]IV 4_1 Contrnet <br />Fwrna.dapi <br />
The URL can be used to link to this page
Your browser does not support the video tag.