My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />CONTRACT FOR: 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />Project No.: IRC -1505 <br />FM No.: 436379-1-54-01 & 436379-1-54-02 <br />Project Description: The proposed improvements to 66th Avenue from north of 49`h Street to north of <br />69`h Street consisting of the widening and reconstruction of the existing <br />roadway to a 4 -lane divided roadway section within the project limits. Curb and <br />gutter and a raised median will be provided. An 8' wide concrete sidewalk will <br />be provided on the west side of the roadway. There are 5 bridges within the <br />project limits. The side streets on the east and west of the intersection <br />approaches will be widened to a 3 -lane roadway section. Also included will be <br />stormwater drainage improvement, pavement markings, traffic signals and <br />landscape and irrigation improvements. <br />OWNER's Bid No. 2021018 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To: <br />And To: <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR <br />to complete all the Work in accordance with the Contract Documents. The items in the tentative <br />list shall be completed or corrected by CONTRACTOR within 30 calendar days of the above date <br />of Substantial Completion. <br />Certificate of Substantial Completion REV 04-07 - 00630 - 1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Admin\Bid Documents\Master Contract Documents\DIV 0_3_Contract <br />Forms.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.