My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00632 - CONTRACTOR'S FINAL CERTIFICATION OF <br />THE WORK <br />(TO ACCOMPANY CONTRACTOR'S FINAL APPLICATION FOR PAYMENT) <br />PROJECT NAME:66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />PROJECT NO: IRC -1505 <br />STATE OF _ <br />COUNTY OF <br />Personally before me the undersigned officer, authorized by the laws of said state to <br />administer oaths, comes , who on oath <br />says: That he is the CONTRACTOR with whom Indian River County, Florida, a political <br />subdivision of said state, did on the day of ,20 , enter <br />into a contract for the performance of certain work, more particularly described as follows: <br />The proposed improvements to 66th Avenue from north of 49th Street to north of 69th <br />Street consisting of the widening and reconstruction of the existing roadway to a 4 - <br />lane divided roadway section within the project limits. Curb and gutter and a raised <br />median will be provided. An 8' wide concrete sidewalk will be provided on the west <br />side of the roadway. There are 5 bridges within the project limits. The side streets on <br />the east and west of the intersection approaches will be widened to a 3-1ane roadway <br />section. Also included will be stormwater drainage improvement, pavement markings, <br />traffic signals and landscape and irrigation improvements. <br />UNDER PENALTY OF PERJURY, affiant further says that said construction has been <br />completed and the Contract therefore fully performed and final payment is now due and that <br />all liens of all firms and individuals contracting directly with or directly employed by such <br />CONTRACTOR have been paid in full EXCEPT: <br />Name Description/Amount <br />who have not been paid and who are due the amount set forth. <br />Affiant further says that: <br />CONTRACTOR has reviewed the Contract Documents. <br />2. CONTRACTOR has reviewed the Work for compliance with the Contract <br />Documents. <br />3. CONTRACTOR has completed the Work in accordance with the Contract <br />Documents. <br />Contractor's Final Certification of the Work - 00632-1 <br />F:\PubIicWorks\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Admin\Bid Documents\Master <br />Contract Documents\DIV 0_3_Contract Forms.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.