My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />Title Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY...............................................................................................................1 <br />1.01 Defined Terms..........................................................................................................................................1 <br />1.02 Terminology..............................................................................................................................................3 <br />ARTICLE 2 - PRELIMINARY MATTERS.................................................................................................................................4 <br />2.01 <br />Delivery of Bonds.....................................................................................................................................4 <br />2.02 <br />Copies of Documents.............................................................................................................................4 <br />2.03 <br />Commencement of Contract Times, Notice to Proceed...................................................................4 <br />2.04 <br />Starting the Work.....................................................................................................................................4 <br />2.05 <br />Before Starting Construction.................................................................................................................4 <br />2.06 <br />Preconstruction Conference..................................................................................................................5 <br />2.07 <br />Initial Acceptance of Schedules............................................................................................................5 <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE.......................................................................5 <br />3.01 <br />Intent..........................................................................................................................................................5 <br />3.02 <br />Reference Standards..............................................................................................................................5 <br />3.03 <br />Reporting and Resolving Discrepancies.............................................................................................6 <br />3.04 <br />Amending and Supplementing Contract Documents.......................................................................6 <br />3.05 <br />Reuse of Documents..............................................................................................................................6 <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE <br />POINTS....................................................................................................................................................................6 <br />4.01 <br />Availability of Lands.................................................................................................................................6 <br />5.02 <br />4.02 <br />Subsurface and Physical Conditions...................................................................................................7 <br />Certificates of Insurance.........................................................................................................................10 <br />4.03 <br />Differing Subsurface or Physical Conditions <br />......................................................................................7 <br />4.04 <br />Underground Facilities............................................................................................................................8 <br />Property Insurance..................................................................................................................................11 <br />4.05 <br />Reference Points.....................................................................................................................................8 <br />5.08 <br />4.06 <br />Hazardous Environmental Condition at Site.......................................................................................9 <br />ARTICLE 5 - BONDS AND INSURANCE................................................................................................................................10 <br />5.01 <br />Performance, Payment, and Other Bonds..........................................................................................10 <br />5.02 <br />Licensed Sureties and Insurers............................................................................................................10 <br />5.03 <br />Certificates of Insurance.........................................................................................................................10 <br />5.04 <br />CONTRACTOR's Liability Insurance...................................................................................................10 <br />5.05 <br />OWNER's Liability Insurance................................................................................................................11 <br />5.06 <br />Property Insurance..................................................................................................................................11 <br />5.07 <br />Waiver of Rights.......................................................................................................................................12 <br />5.08 <br />Receipt and Application of Insurance Proceeds................................................................................13 <br />5.09 <br />Acceptance of Bonds and Insurance; Option to Replace................................................................13 <br />5.10 <br />Partial Utilization, Acknowledgment of PropertyInsurer..................................................................13 <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES..........................................................................................................13 <br />6.01 <br />Supervision and Superintendence..............................:........................................................................13 <br />6.02 <br />Labor; Working Hours.............................................................................................................................14 <br />6.03 <br />Services, Materials, and Equipment....................................................................................................14 <br />6.04 <br />Progress Schedule..................................................................................................................................14 <br />6.05 <br />Substitutes and "Or-Equals"..................................................................................................................14 <br />6.06 <br />Concerning Subcontractors, Suppliers, and Others.........................................................................16 <br />6.07 <br />Patent Fees and Royalties.....................................................................................................................16 <br />6.08 <br />Permits.......................................................................................................................................................17 <br />6.09 <br />Laws and Regulations............................................................................................................................17 <br />6.10 <br />Taxes.........................................................................................................................................................17 <br />General Conditions - 00700 -11 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\t-Admin\Bid Documents\Master Contract Documents\DIV 0_4_Conditions of the <br />Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.