My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. a preliminary schedule of values for <br />all of the Work which includes quantities and <br />prices of items which when added together <br />equal the Contract Price and subdivides the <br />Work into component parts in sufficient detail to <br />serve as the basis for progress payments during <br />performance of the Work. Such prices will <br />include an appropriate amount of overhead and <br />profit applicable to each item of Work. <br />2.06 Preconstruction Conference <br />2.07 Initial Acceptance of Schedules <br />A. Unless otherwise provided in the Contract <br />Documents, at least ten days before submission of the <br />first Application for Payment a conference attended by <br />CONTRACTOR, ENGINEER, and others as appropri- <br />ate will be held to review for acceptability to ENGI- <br />NEER as provided below the schedules submitted in <br />accordance with paragraph 2.05.8. CONTRACTOR <br />shall have an additional ten days to make corrections <br />and adjustments and to complete and resubmit the <br />schedules. No progress payment shall be made to <br />CONTRACTOR until acceptable schedules are <br />submitted to ENGINEER. <br />1. The progress schedule will be accept- <br />able to ENGINEER if it provides an orderly <br />progression of the Work to completion within <br />any specified Milestones and the Contract <br />Times. Such acceptance will not impose on <br />ENGINEER responsibility for the progress <br />schedule, for sequencing, scheduling, or <br />progress of the Work nor interfere with or relieve <br />CONTRACTOR from CONTRACTOR's full <br />responsibility therefor. <br />2. CONTRACTOR's schedule of Shop <br />Drawing and Sample submittals will be <br />acceptable to ENGINEER if it provides a <br />workable arrangement for reviewing and <br />processing the required submittals. <br />3. CONTRACTOR's schedule of values <br />will be acceptable to ENGINEER as to form and <br />substance if it provides a reasonable allocation <br />of the Contract Price to component parts of the <br />Work. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, <br />AMENDING, REUSE <br />3.01 Intent <br />A. The Contract Documents are comple- <br />mentary; what is called for by one is as binding as if <br />called for by all. <br />B. It is the intent of the Contract Documents to <br />describe a functionally complete Project (or part there- <br />of) to be constructed in accordance with the Contract <br />Documents. Any labor, documentation, services, <br />materials, or equipment that may reasonably be <br />inferred from the Contract Documents or from <br />prevailing custom or trade usage as being required to <br />produce the intended result will be provided whether or <br />not specifically called for at no additional cost to <br />OWNER. <br />C. Clarifications and interpretations of the <br />Contract Documents shall be issued by ENGINEER as <br />provided in Article 9. <br />3.02 Reference Standards <br />A. Standards, Specifications, Codes, Laws, and <br />Regulations <br />1. Reference to standards, specifica- <br />tions, manuals, or codes of any technical <br />society, organization, or association, or to Laws <br />or Regulations, whether such reference be <br />specific or by implication, shall mean the stan- <br />dard, specification, manual, code, or Laws or <br />Regulations in effect at the time of opening of <br />Bids (or on the Effective Date of the Agreement <br />if there were no Bids), except as may be <br />otherwise specifically stated in the Contract <br />Documents. <br />2. No provision of any such standard, <br />specification, manual or code, or any instruction <br />of a Supplier shall be effective to change the <br />duties or responsibilities of OWNER, <br />CONTRACTOR, or ENGINEER, or any of their <br />subcontractors, consultants, agents, or employ- <br />ees from those set forth in the Contract <br />Documents, nor shall any such provision or <br />instruction be effective to assign to OWNER, <br />General Conditions - 00700 - 5 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening -49th Sl to 69th St\l-Admin\Bid Documents\Master Contract Documents\DIV 0_4_Conditions of the <br />Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.