My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lands in accordance with applicable Laws and Regula- <br />tions. <br />C. CONTRACTOR shall provide for all additional <br />lands and access thereto that may be required for <br />temporary construction facilities or storage of materials <br />and equipment. <br />4.02 Subsurface and Physical Conditions <br />A. Reports and Drawings: The Supplementary <br />Conditions identify: <br />1. those reports of explorations and <br />tests of subsurface conditions at or contiguous <br />to the Site that ENGINEER has used in <br />preparing the Contract Documents; and <br />2. those drawings of physical <br />conditions in or relating to existing surface or <br />subsurface structures at or contiguous to the <br />Site (except Underground Facilities) that ENGI- <br />NEER has used in preparing the Contract <br />Documents. <br />B. Limited Reliance by CONTRACTOR on <br />Technical Data Authorized: CONTRACTOR may rely <br />upon the general accuracy of the "technical data" <br />contained in such reports and drawings, but such <br />reports and drawings are not Contract Documents. <br />Such "technical data" is identified in the Supplementary <br />Conditions. Except for such reliance on such <br />"technical data," CONTRACTOR may not rely upon or <br />make any Claim against OWNER, ENGINEER, or any <br />of ENGINEER's Consultants with respect to: <br />1. the completeness of such reports and <br />drawings for CONTRACTOR's purposes, <br />including, but not limited to, any aspects of the <br />means, methods, techniques, sequences, and <br />procedures of construction to be employed by <br />CONTRACTOR, and safety precautions and <br />programs incident thereto; or <br />2. other data, interpretations, opinions, <br />and information contained in such reports or <br />shown or indicated in such drawings; or <br />3. any CONTRACTOR interpretation of <br />or conclusion drawn from any "technical data" or <br />any such other data, interpretations, opinions, or <br />information. <br />4.03 Differing Subsurface or Physical Conditions <br />A. Notice: If CONTRACTOR believes that any <br />subsurface or physical condition at or contiguous to the <br />Site that is uncovered or revealed either: <br />1. is of such a nature as to establish that <br />any "technical data" on which CONTRACTOR is <br />entitled to rely as provided in paragraph 4.02 is <br />materially inaccurate; or <br />2. is of such a nature as to require <br />change in the Contract Documents; or <br />3. differs materially from that shown or <br />indicated in the Contract Documents; or <br />4. is of an unusual nature, and differs <br />materially from conditions ordinarily <br />encountered and generally recognized as inher- <br />ent in work of the character provided for in the <br />Contract Documents; <br />then CONTRACTOR shall, promptly after becoming <br />aware thereof and before further disturbing the <br />subsurface or physical conditions or performing any <br />Work in connection therewith (except in an emergency <br />as required by paragraph 6.16.A), notify OWNER and <br />ENGINEER in writing about such condition. <br />CONTRACTOR shall not further disturb such condition <br />or perform any Work in connection therewith (except <br />as aforesaid) until receipt of written order to do so. <br />B. ENGINEER's Review. After receipt of written <br />notice as required by paragraph 4.03.A, ENGINEER <br />will promptly review the pertinent condition, determine <br />the necessity of OWNER's obtaining additional <br />exploration or tests with respect thereto, and advise <br />OWNER in writing (with a copy to CONTRACTOR) of <br />ENGINEER's findings and conclusions. <br />C. Possible Price and Times Adjustments <br />1. The Contract Price or the Contract <br />Times, or both, will be equitably adjusted to the <br />extent that the existence of such differing <br />subsurface or physical condition causes an in- <br />crease or decrease in CONTRACTOR's cost of, <br />or time required for, performance of the Work; <br />subject, however, to the following: <br />a. such condition must meet any one or <br />more of the categories described in para- <br />graph 4.03.A; and <br />b. with respect to Work that is paid for on <br />a Unit Price Basis, any adjustment in <br />Contract Price will be subject to the <br />provisions of paragraphs 9.08 and 11.03. <br />2. CONTRACTOR shall not be entitled <br />to any adjustment in the Contract Price or <br />Contract Times if: <br />a. CONTRACTOR knew of the <br />existence of such conditions at the time <br />CONTRACTOR made a final commitment to <br />OWNER in respect of Contract Price and <br />Contract Times by the submission of a Bid or <br />General Conditions - 00700 - 7 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Admin\Bid Documents\Master Contract Documents\DIV 0_4_Conditions of the <br />Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.