My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment will be considered functionally equal <br />to an item so named if: <br />a. in the exercise of reasonable <br />judgment ENGINEER determines that: (i) it <br />is at least equal in quality, durability, <br />appearance, strength, and design <br />characteristics; (ii) it will reliably perform at <br />least equally well the function imposed by <br />the design concept of the completed Project <br />as a functioning whole, and; <br />b. CONTRACTOR certifies that: (i) there <br />is no increase in cost to the OWNER; and (ii) <br />it will conform substantially, even with <br />deviations, to the detailed requirements of <br />the item named in the Contract Documents. <br />2. Substitute Items <br />a. If in ENGINEER's sole discretion an <br />item of material or equipment proposed by <br />CONTRACTOR does not qualify as an <br />"or -equal" item under paragraph 6.05.A.1, it <br />will be considered a proposed substitute <br />item. <br />b. CONTRACTOR shall submit suffi- <br />cient information as provided below to allow <br />ENGINEER to determine that the item of <br />material or equipment proposed is <br />essentially equivalent to that named and an <br />acceptable substitute therefor. Requests for <br />review of proposed substitute items of <br />material or equipment will not be accepted <br />by ENGINEER from anyone other than <br />CONTRACTOR. <br />c. The procedure for review by ENGI- <br />NEER will be as set forth in paragraph <br />6.05.A.2.d, as supplemented in the General <br />Requirements and as ENGINEER may <br />decide is appropriate under the <br />circumstances. <br />d. CONTRACTOR shall first make <br />written application to ENGINEER for review <br />of a proposed substitute item of material or <br />equipment that CONTRACTOR seeks to <br />furnish or use. The application shall certify <br />that the proposed substitute item will perform <br />adequately the functions and achieve the <br />results called for by the general design, be <br />similar in substance to that specified, and be <br />suited to the same use as that specified. The <br />application will state the extent, if any, to <br />which the use of the proposed substitute <br />item will prejudice CONTRACTOR's <br />achievement of Substantial Completion on <br />time, whether or not use of the proposed <br />substitute item in the Work will require a <br />change in any of the Contract Documents (or <br />in the provisions of any other direct contract <br />with OWNER for work on the Project) to <br />adapt the design to the proposed substitute <br />item and whether or not incorporation or use <br />of the proposed substitute item in connection <br />with the Work is subject to payment of any <br />license fee or royalty. All variations of the <br />proposed substitute item from that specified <br />will be identified in the application, and <br />available engineering, sales, maintenance, <br />repair, and replacement services will be <br />indicated. The application will also contain <br />an itemized estimate of all costs or credits <br />that will result directly or indirectly from use <br />of such substitute item, including costs of <br />redesign and claims of other contractors <br />affected by any resulting change, all of which <br />will be considered by ENGINEER in <br />evaluating the proposed substitute item. <br />ENGINEER may require CONTRACTOR to <br />furnish additional data about the proposed <br />substitute item. <br />B. Substitute Construction Methods or Proce- <br />dures: If a specific means, method, technique, se- <br />quence, or procedure of construction is shown or <br />indicated in and expressly required by the Contract <br />Documents, CONTRACTOR may furnish or utilize a <br />substitute means, method, technique, sequence, or <br />procedure of construction approved by ENGINEER. <br />CONTRACTOR shall submit sufficient information to <br />allow ENGINEER, in ENGINEER's sole discretion, to <br />determine that the substitute proposed is equivalent to <br />that expressly called for by the Contract Documents. <br />The procedure for review by ENGINEER will be similar <br />to that provided in subparagraph 6.05.A.2. <br />C. Engineer's Evaluation: ENGINEER will be <br />allowed a reasonable time within which to evaluate <br />each proposal or submittal made pursuant to para- <br />graphs 6.05.A and 6.05.13. ENGINEER will be the sole <br />judge of acceptability. No "or -equal" or substitute will <br />be ordered, installed or utilized until ENGINEER's <br />review is complete, which will be evidenced by either a <br />Change Order for a substitute or an approved Shop <br />Drawing for an `or equal." ENGINEER will advise <br />CONTRACTOR in writing of any negative <br />determination. <br />D. Special Guarantee: OWNER may require <br />CONTRACTOR to furnish at CONTRACTOR's ex- <br />pense a special performance guarantee or other surety <br />with respect to any substitute. <br />E. ENGINEER's Cost Reimbursement. <br />ENGINEER will record time required by ENGINEER <br />and ENGINEER's Consultants in evaluating substitute <br />proposed or submitted by CONTRACTOR pursuant to <br />paragraphs 6.05.A.2 and 6.05.13 and in making <br />changes in the Contract Documents (or in the <br />General Conditions - 00700 - 15 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Admin0d Documents\Master Contract Documents\DIV 0_4_Condifions of the <br />Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.