My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. the extent of such authority and <br />responsibilities will be provided. <br />B. Unless otherwise provided in the <br />Supplementary Conditions, OWNER shall have sole <br />authority and responsibility for such coordination. <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these <br />General Conditions, OWNER shall issue all communi- <br />cations to CONTRACTOR through ENGINEER. <br />8.02 Replacement of ENGINEER <br />A. In case of termination of the employment of <br />ENGINEER, OWNER shall appoint an engineer to <br />whom CONTRACTOR makes no reasonable <br />objection, whose status under the Contract Documents <br />shall be that of the former ENGINEER. <br />8.03 Furnish Data <br />A. OWNER shall promptly furnish the data <br />required of OWNER under the Contract Documents. <br />8.04 Pay Promptly When Due <br />A. OWNER shall make payments to CONTRAC- <br />TOR promptly when they are due as provided in <br />paragraphs 14.02.0 and 14.07.C. <br />8.05 Lands and Easements; Reports and Tests <br />A. OWNER's duties in respect of providing lands <br />and easements and providing engineering surveys to <br />establish reference points are set forth in paragraphs <br />4.01 and 4.05. Paragraph 4.02 refers to OWNER's <br />identifying and making available to CONTRACTOR <br />copies of reports of explorations and tests of <br />subsurface conditions and drawings of physical <br />conditions in or relating to existing surface or <br />subsurface structures at or contiguous to the Site that <br />have been utilized by ENGINEER in preparing the <br />Contract Documents. <br />8.06 Insurance <br />A. OWNER's responsibilities, if any, in respect to <br />purchasing and maintaining liability and property insur- <br />ance are set forth in Article 5. <br />8.07 Change Orders <br />A. OWNER is obligated to execute Change <br />Orders as indicated in paragraph 10.03. <br />8.08 Inspections, Tests, and Approvals <br />A. OWNER's responsibility in respect to certain <br />inspections, tests, and approvals is set forth in <br />paragraph 13.03.6. <br />8.09 Limitations on OWNER's Responsibilities <br />A. The OWNER shall not supervise, direct, or <br />have control or authority over, nor be responsible for, <br />CONTRACTOR's means, methods, techniques, se- <br />quences, or procedures of construction, or the safety <br />precautions and programs incident thereto, or for any <br />failure of CONTRACTOR to comply with Laws and <br />Regulations applicable to the performance of the Work. <br />OWNER will not be responsible for CONTRACTOR's <br />failure to perform the Work in accordance with the <br />Contract Documents. <br />8.10 Undisclosed Hazardous Environmental <br />Condition <br />A. OWNER's responsibility in respect to an <br />undisclosed Hazardous Environmental Condition is set <br />forth in paragraph 4.06. <br />8.11 Evidence of Financial Arrangements <br />A. If and to the extent OWNER has agreed to <br />furnish CONTRACTOR reasonable evidence that <br />financial arrangements have been made to satisfy <br />OWNER's obligations under the Contract Documents, <br />OWNER's responsibility in respect thereof will be as <br />set forth in the Supplementary Conditions. <br />ARTICLE 9 - ENGINEER'S STATUS DURING <br />CONSTRUCTION <br />9.01 OWNER'S Representative <br />A. ENGINEER will be OWNER's representative <br />during the construction period. The duties and <br />responsibilities and the limitations of authority of <br />ENGINEER as OWNER's representative during <br />construction are set forth in the Contract Documents <br />and will not be changed without written consent of <br />OWNER and ENGINEER. <br />9.02 Visits to Site <br />A. ENGINEER will make visits to the Site at inter- <br />vals appropriate to the various stages of construction <br />as ENGINEER deems necessary in order to observe <br />as an experienced and qualified design professional <br />the progress that has been made and the quality of the <br />various aspects of CONTRACTOR's executed Work. <br />Based on information obtained during such visits and <br />General Conditions - 00700 - 22 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening 49th St to 69th St\t-Admin\Bid Documents\Master Contract Documents\DIV 0_4_Conditions of the <br />Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.