My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1505 <br />SC -2.06 Preconstruction Conference <br />SC -2.06 Delete paragraph GC -2.06.A in its entirety and insert the following paragraph in its place: <br />A. Immediately after awarding the contract, but before the CONTRACTOR begins work, <br />the Project Manager will call a preconstruction conference at a place the ENGINEER <br />designates to establish an understanding among the parties as to the work and to <br />discuss schedules referred to in paragraph 2.05.6, procedures for handling Shop <br />Drawings and other submittals, and maintaining required records. Utility companies <br />and others as appropriate will be requested to attend to discuss and coordinate work. <br />B. Per the FDOT Standard Specifications for Road and Bridge Construction, the <br />Contractor will certify to the Engineer the following: <br />1. A listing of on-site clerical staff, supervisory personnel and their pro -rated time <br />assigned to the contract, <br />2. Actual Rate for items listed in Table 4-3.2.1 (see below), <br />3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits and a <br />Retirement Plan, and, <br />4. Payment of Per Diem is a company practice for instances when compensation for Per <br />Diem is requested. <br />Such certification must be made by an officer or director of the Contractor with authority <br />to bind the Contractor. Timely certification is a condition precedent to any right of the <br />Contractor to recover compensations for such costs, and failure to timely submit the <br />certification will constitute a full, complete, absolute and irrevocable waiver by the <br />Contractor of any right to recover such costs. Any subsequent changes shall be certified <br />to the Engineer as part of the cost proposal or seven calendar days in advance of <br />performing such extra work. <br />FDOT Table <br />4-3.2.1 <br />Item <br />Rate <br />FICA <br />Rate established by Law <br />FUTA/SUTA <br />Rate established by Law <br />Medical Insurance <br />Actual <br />Holidays, Sick & Vacation Benefits <br />Actual <br />Retirement Benefits <br />Actual <br />Workers Compensation <br />Rates based on the National Council on <br />Compensation Insurance basic rates tables <br />adjusted by Contractor's actual experience <br />modification factor in effect at the time of the <br />additional work or unforeseen work <br />Per Diem <br />Actual but not to exceed State of Florida's rate <br />Insurance* <br />Actual <br />i <br />*Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br />insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc.). <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />A. In case of discrepancy, the governing order of the documents shall be as follows: <br />1. Written Interpretations <br />Supplementary Conditions - 00800-3 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening_49th St to 69th St\1-Admin0d DocumentsWaster Contract Documents\DIV 0 5 Conditions <br />of the Contract.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.