My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-062A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:48:43 PM
Creation date
5/6/2021 12:48:15 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL FOR CONSTRUCTION M NTERLALS TESTING AND MONITORING SERyTCF-S <br />MOORHEN N'L)ASH Low ENERGY AQUATIC PLANT SYSTEM (LEAPSTM) <br />INDLAN RrVER COLNTY , FLORIDA <br />RACE PRonosaL No. P20-1599 <br />Estimated Man -Hours (based on an approximate 5-month/20-week involvement) <br />• Sr. Project Engineer; 20 weeks (✓ 3 hours/week (C, $'120.00/hour................................ $7,200.00 <br />• Sr. Engineering Technician; 20 weeks @ 40 hours/-'yeek* a; $79.00/hour........................: $47,200.00 <br />• Technical Secretary; 20 weeks a 2 hours/week @ $48.00/hour.................................. $1,920.00 <br />(*Assuming 8 -hour work days, Monday through Friday) <br />Laboratory Testing <br />•15 Proctor Tests @ $85.00/test............................................................$1,275.00 <br />• 4 LBR Tests @ $315.00/test............................................................... $1,260.00 <br />• Allowance for acceptability testing (organic content, percent fines, carbonate content, etc.) ............ $1,500.00 <br />Concrete Testing <br />Proposed Sampling/Testing Frequency_ <br />A minimum of one set of four (4) cylinders (7 -day, 2x28 -day and Hold cylinder) and one slump test will be made for every <br />pour, and for each 50 cubic yards for larger pours. We have also include an allowance for air content and unit weight testing, <br />if needed. <br />• Concrete/Grout Sampling; estimated 150 sets @ $88.00/set.................................... $13,200.00 <br />• Air Content (if needed); 50 tests @ $35.00/test............................................... $1,750.00 <br />• Unit Xk%eight (if needed); 50 tests @ $45.00/test ......... . <br />.....................................$2,250.00 <br />• Allowance for cylinder pick-up (not scheduled with other work) <br />and limited standby during concrete pours; 50 hours @ $59.00/hour .............................. $2,950.00 <br />TOTAL ANTICIPATED TESTING BUDGET ........... $80,505.00 <br />The following conditions apply to this project: <br />(1) When not present frill -time, the Contractor (or Indian River County Representative) must contact Andersen Andre <br />Consulting Engineers, Inc. at (77 2) 807-9191 a minimum of 24 hours prior to any testing and 48 hours prior to <br />weekend, holiday and evening work. <br />(2) Unit rates apply to standard working days, Monday- through Friday, 7:30 a.m to 5:00 p.m. Testing and hourly rates <br />will be increased by 50% for weekend, holiday or after-hours services. <br />(3) If our testing estimate for a specific work element is insufficient for that particular activity, resources from another <br />work element can be used without prior authorization from the client as long as our total cost estimate is not <br />exceeded. We will notify you in advance if it appears that the cost estimate presented in the attached unit fee <br />schedule will be exceeded. <br />(4) Asphalt sampling/ testing, is not included herein. We will be pleased to revise this proposal to include such testing, <br />if needed. <br />ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />WWW.AACEINC.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.