My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/02/2021
CBCC
>
Meetings
>
2020's
>
2021
>
03/02/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 2:04:48 PM
Creation date
5/10/2021 2:02:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/02/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All Suncoast Electric, Inc. <br />2855 Kirby Circle NE #2 <br />FL 32905 <br />Name / Address <br />Indian River County Utilities <br />4350 41st Street <br />Vero Beach, F132967 <br />Estimate <br />Date <br />Estimate # <br />2/16/2021 <br />16791 <br />Ship To <br />West Regional Waste Water Facility <br />8405 8th Street <br />Vero, Fl <br />1JL <br />Project <br />West Regional WW ... <br />Description <br />Qty <br />Rate <br />Total <br />WET LOCATION EXIT LED <br />6 <br />0.00 <br />2X4 LED SELECT A COLOR 5200 LUMENS <br />24 <br />0.00 <br />2X4 WITH EMG BACKUP <br />3 <br />0.00 <br />2X4 CEILING KIT <br />27 <br />0.00 <br />13" ROUND CEILING FIXTURE <br />3 <br />0.00 <br />13" ROUND FIXTURE WITH EMERG BACK UP <br />3 <br />0.00 <br />LED T8 HYBRID <br />88 <br />0.00 <br />T SURFACE WRAP <br />15 <br />0.00 <br />8" RECESS LED WITH TRIM UP TO 12.65 <br />9 <br />0.00 <br />LED A 19 LAMP <br />4 <br />0.00 <br />150W LED AREA LIGHT <br />23 <br />0.00 <br />2H POLE ADAPTERS <br />7 <br />0.00 <br />100W LED FLOOD <br />44 <br />0.00 <br />150W LED UFO HIGHBAY <br />8 <br />0.00 <br />60W LED WALL PACK <br />9 <br />0.00 <br />30W LED MINI WALL PACK <br />7 <br />0.00 <br />RECYCLE LAMPS PER FLORIDA DEP MANDATE <br />949 <br />0.00 <br />"REPLACE ALL FIXTURES AND LAMP PER PROJECT <br />LABOR AND MATERIALS <br />1 <br />41,866.40 <br />41,866.40 <br />Total $41,866.40 <br />1JL <br />
The URL can be used to link to this page
Your browser does not support the video tag.