My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/02/2021
CBCC
>
Meetings
>
2020's
>
2021
>
03/02/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 2:04:48 PM
Creation date
5/10/2021 2:02:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/02/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qrw <br />of <br />INDIAN RIVER COUNTY, FLORIDA low <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka P.E., Public Works Director <br />FROM: W. Keith McCully, P.E., Stormwater Engineer <br />SUBJECT: Approval of SJRWMD Cost -Share Grant #36528 for Moorhen Marsh Low Energy <br />Aquatic Plant System <br />DATE: February 19, 2021 <br />DESCRIPTION AND CONDITIONS <br />St Johns River Water Management District (SJRWMD) recently awarded Indian River County a $1,250,000 <br />Cost -Share Grant for the proposed Moorhen Marsh Low Energy Aquatic Plant System, which is nearing <br />design completion. The facility will remove nitrogen and phosphorus from waters of the Indian River Farms <br />Water Control District's North Relief Canal prior to discharge into the Indian River Lagoon. Based on a one- <br />year pilot plant study, staff estimates that approximately 4,854 pounds of nitrogen and 785 pounds of <br />phosphorus may be removed from the canal water annually. SJRWMD staff prepared the attached Cost - <br />Share Agreement (Contract #36528) and forwarded it to the County for review and execution. Staff has <br />reviewed the Agreement and has no recommended revisions. <br />FUNDING <br />The predesign estimated project cost is approximately $7,960,000. The SJRWMD Cost -Share Grantwill fund <br />up to $1,250,000 of the project cost, which equals approximately 15.7% of the estimated project cost. <br />Currently, the 20/21 approved Capital Improvement Element has $2,950,000 budgeted in 20/21 and <br />$3,400,000 budgeted in 21/22 in Optional Sales Tax/Public Works/Construction in Progress/PC North — <br />Account #31524338-066510-16018. The project has a $650,000 legislative grant (Agreement Number <br />LPA0018). <br />RECOMMENDATION <br />Staff recommends that the County Commission approve the attached Cost -Share Agreement and authorize <br />the Chairman to execute it on behalf of the County. <br />ATTACHMENTS <br />Cost -Share Agreement with SJRWMD (Contract #36528) <br />IRC Grant Form <br />APPROVED AGENDA ITEM FOR MARCH 2.2021 <br />92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.