My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-064A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-064A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 10:20:25 AM
Creation date
5/17/2021 10:51:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/20/2021
Control Number
2021-064A
Agenda Item Number
8.I.
Entity Name
Boromei Construction, Inc.
Subject
Change Order for Data Flow System Antenna and Tower Replacement
Project Number
2020049
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Boromei Construction <br />PROJECT: <br />Indian River County <br />CHANGE ORDER NUMBER: <br />(Name, address) <br />1800 27th St. <br />DATE: <br />The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) <br />Vero Beach, FL <br />OWNER'S PROJECT NO: <br />4,500.00 <br />The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be ............ $ <br />CONTRACT DATE: <br />CONTRACTOR: <br />Boromei Construction, Inc. <br />CONTRACT FOR: <br />(Name, address) <br />420B NW 3rd St. <br />been authorized by Construction Change Directive. <br />Okeechobee, FL 34972 <br />The Contract is changed as follows: <br />The addition of costs for inspection fees. <br />Boromei Construction, Inc <br />CHANGE <br />ORDER <br />1 <br />3.25.2021 <br />2020049 <br />9.22.2020 <br />$4,500.00 <br />The original (Contract Sum) (Guaranteed Maximum Price) was ................................................$ <br />109,663.00 <br />Net change by previously authorized Change Orders..............................................................$ <br />0.00 <br />The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was .........................$ <br />109,663.00 <br />The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) <br />(unchanged) by this Change Order in the amount of...........................................................$ <br />4,500.00 <br />The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be ............ $ <br />114,163.00 <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />() days. <br />The date of Final Completion as of the date of this Change Order therefore is <br />NOTE This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have <br />been authorized by Construction Change Directive. <br />CONTRACTOR <br />Boromei Construction, Inc. <br />Address <br />420B NW 3rd St. <br />Oke obee, FL 34972 <br />B <br />DATE tGk. Qt. Q1 <br />OWNER: <br />Indian River County <br />Address <br />1800 27th St. <br />Vero a ch, FL 3296 s <br />BY <br />J eph E. Flesc erXi <br />D 04-20-2021 : moo. = <br />E s <br />APKROVED AS TO Fop.�,jj <br />AS`40 LEGAL 3UFFiCi1EiNr,'`X° <br />BY <br />,..J'."%. 1`�.FV D aX�lX�w'6�r,J <br />0 s= N1TY ATTO O R I NJ r_—y <br />Attest: Jeffrey R. Smith, Clerk of <br />Circuit Court and Comptroller <br />W <br />Deputy Cle <br />
The URL can be used to link to this page
Your browser does not support the video tag.