My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-054A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-054A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 1:47:48 PM
Creation date
5/18/2021 1:47:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/13/2021
Control Number
2021-054A
Agenda Item Number
8.E.
Entity Name
Costello Brothers Marine Construction, Inc.
Subject
Egret Marsh Slide Gate Replacement Project
Area
7295 4th Street
Bid Number
2021035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Costello <br />Brothers Marine Construction, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in <br />consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />This project involves removing up to six existing slide gates and replacing them with up to six <br />new slide gates at Egret Marsh Stormwater Park and Nature Preserve (Egret Marsh). <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: EGRET MARSH SLIDE GATE REPLACEMENT PROJECT <br />Bid Number: 2021035 <br />Project Address: 7295 4T" Street, Vero Beach, FL 32968 <br />ARTICLE 3 - CONTRACT TIMES <br />3.1 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.2 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 15th day after the date <br />when all material arrives at the job site. <br />ARTICLE 4 - CONTRACT PRICE <br />4.1 OWNER shall pay CONTRACTOR for completion of the Work an amount in current funds equal to <br />the sum of the amounts determined pursuant to paragraph 4.01.A and summarized in paragraph <br />4.01.6, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as Exhibit 1. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract Documents: <br />c:\granicus\legistar5\15\temp\6cdd36a3-c034-4520-a45a-25de4329456d.doc <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.