My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-048A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-048A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 11:30:00 AM
Creation date
5/24/2021 11:29:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/06/2021
Control Number
2021-048A
Agenda Item Number
8.M.
Entity Name
CenState Contractors, Inc.
Subject
Central Wastewater Treatment Facility RAS/WAS Pump Replacements
Bid Number
2021022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"-�-4 <br />SECTION 00530 — EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br />Central Wastewater Treatment Facility RAS/WAS Pump Replacements <br />THIS AGREEMENT ("Agreement" or "Contract'), dated the 6th day of April in the year <br />2021 by and between Indian River County, a political subdivision of the State of Florida (hereinafter <br />called OWNER) and CenState Contractors. Inc. .(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish and <br />complete all of the necessary labor, material, and equipment to perform the work as specified <br />or indicated in the Contract Documents and per Indian County Department of Utility Services <br />(IRCDUS) standards. The work is generally described as follows: <br />Demolition, cleanup, removal, and disposal of existing equipment and materials associated <br />with the RAS and WAS pumping systems, including VFDs, rotary drum thickener equipment, <br />and level instrumentation, to the limits indicated on the Drawings, and as specified herein. <br />The work also includes the supply, installation, wiring, connection, testing and startup of <br />proposed RAS and WAS pumping equipment including VFDs, rotary drum thickener <br />equipment, level instrumentation, piping, fittings, valves, supports, and appurtenances as <br />shown on the Drawings and specified herein <br />ARTICLE 2 ENGINEER <br />The Central WWTF RAS/WAS pump replacement project has been designed by Arcadis, hereinafter <br />called ENGINEER, and who is to act as OWNER'S representative, assume all duties and <br />responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in <br />connection with completion of the work in accordance with the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Submit shop drawings for all materials and equipment to be utilized on the job. <br />3. Perform all photographic recording and documentation of conditions prior to <br />construction. <br />4. Locate all existing utilities in the area of work. <br />5. Secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials and prepare the site. <br />7. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 31 calendar days to 300 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />Install all mechanical and electrical equipment, pipe and appurtenant <br />00530-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.