Laserfiche WebLink
REVISED EXHIBIT 1 ATKI N <br />M mker of the SNC-Lavalia Group <br />Indian River County Continuing Engineering Services RFQ 2018008 <br />2021 Contract Extension <br />As requested, below are the proposed billing rates associated with this contract <br />extension for Atkins North America, Inc. <br />RATES ARE EFFECTIVE MAY 18, 2021 THROUGH APRIL 16, 2023 <br />Labor Category <br />2021 Proposed <br />Billing Rate <br />Sr. Project Manager <br />$220.00 <br />Project Manager <br />$208.00 <br />Project Controls Manager <br />$150.00 <br />Sr Engineer IV <br />$240.00 <br />Sr Engineer III <br />$192.00 <br />Sr Engineer II <br />$165.00 <br />Sr Engineer 1 <br />$136.00 <br />Engineer II <br />$110.00 <br />Engineer 1 <br />$105.00 <br />Engineer Intern <br />$80.00 <br />Chief Designer <br />$165.00 <br />Sr Designer 1 <br />$136.00 <br />Sr Designer II <br />$154.00 <br />CAD Designer II <br />$104.00 <br />Senior GIS Analyst III <br />$145.00 <br />GIS Analyst 1 <br />$120.00 <br />Sr Landscape Architect IV <br />$200.00 <br />Sr Landscape Architect III <br />$145.00 <br />Landscape Architect 1 <br />$70.00 <br />Sr Estimator/Scheduler 1 <br />$155.00 <br />Survey Two Person Crew <br />$165.00 <br />Survey Three Person Crew <br />$224.00 <br />Survey Four Person Crew <br />$286.00 <br />Sr Scientist III <br />$203.00 <br />Sr Scientist II <br />$155.00 <br />Sr Scientist 1 <br />$136.00 <br />Scientist II <br />$104.00 <br />Scientist 1 <br />$92.00 <br />Administrative Coordinator 1 <br />$88.00 <br />