Laserfiche WebLink
Atkins North America, Inc. <br />ATKINS 482 South Keller Road Orlando, Fl <br />SIVC • L A1TA I IN 407.806-4108 <br />Mernber of the SNC- Lavahn Group <br />Indian River County Utilities <br />Project <br />West WWTP Oxidation Tank Monitoring Survey <br />Scope of Services - Surveying <br />General <br />The services for this project will include structural monitoring of a oxidation ditch (tank) <br />walls at the Indian River County West Regional WWTF. Atkins will establish 72 <br />Monitoring Points (MPs) on 27 different locations around the tank's outside walls and <br />crossing bridges to obtain horizontal and vertical positions. The MPs will be established <br />at bottom, middle, top of walls and along 3 (three) crossing bridges on the top of the <br />tank. Approximate MP locations are shown at the end of this document. The MPs will be <br />located 3 (three) times, first time when the tank is full, second time when the tank is <br />empty and the third time when the tank is full again. The storage tank will be scanned <br />utilizing a High -Resolution Laser Scanner to generate a 3D model to capture existing <br />tank features to facilitate the design of any new improvements by the Engineers. Atkins <br />surveyors will utilize a combination of robotic total stations, First -order digital level with a <br />barcoded INVAR rod, Fixed Scanning Technology and RTK GPS to collect information. <br />Specific Surrey Tasks <br />1. Atkins will perform a high -order conventional geodetic survey to establish <br />horizontal and vertical control points around the wastewater tank. The control <br />points will be tied to the NAD 83 (2011 adjustment) of the Florida State Plane <br />Coordinate System and NAVD 88 Elevations. <br />2. Establish MPs on the tank's outside wall and crossing bridges. <br />3. Located the MPs 3 (three) times. <br />4. Scan the tank when is empty from the top, standing at different locations on the <br />crossing bridges to capture the tank's inside features and at ground level to capture <br />the outside tank's features. <br />5. Once the monitoring work is completed, Atkins will remove the MPs from the tank's <br />walls. <br />6. The survey deliverables will include 1" = 20' scale base file drawing in AutoCAD <br />Civil 3D format with the MP locations, a registered point cloud on e57 format (31D <br />model) and target deltas report. <br />Limitations <br />1. Facilities or areas to be surveyed are readily accessible. <br />