Laserfiche WebLink
21-195- lnterioir '.rooitNfigAppiicaiPion <br />Vero Florida <br />April 310, 20, 21 <br />�Page 4 <br />(2) Abiasive blast to remove existang co tun rust, corrosion, mid other foreign contairninantsfrom the <br />subawhate while achieving a minirrium angular ancl-ior profile of 3,0 mils. <br />(3) Apply a prime coal of TriernecSeries 120 5100' 'Vinest r at 15,x,..18.10 mils. DF -F, <br />(4) Apply a finish, coat of 1 nearer: Series 120-5001 Vinester at 15,0 18 .0 mils Dl V <br />5 MATERIALS AND SERVICES FURNISJ IED BY .0 LI OR 074111ERS <br />It is understood that the following slervilcesshatl be provided by others without expense toCCR� <br />,a. Chent WH grant or obtain free access to the site for all equipment and personnel necessary for CC R, 'to <br />perform th(� lwr,.)rk set forth in, this Proposal. The Client wilil notify any and all processors of the projec-1 site <br />that Client has granted CCR free access to the site. C CR will take reasonable precautions to minimize <br />damage to the site, but iit is understood by Client that, iru the normal course of work, some damage may <br />occur,, and the correction of such damage is riot part of this Agreement unless so specified in the ProposaL <br />b. The Client is responsible for the accuracy of locations for all subterranean structures and utilities, CCR will <br />take responsible precautions to avoid known subterranean structures, and the Client waives any clairn <br />against CCR 1, and agrees to diefend, indemnify, and hold CCR harmless from arry clairn or liability for injury <br />or loss, including costs to defend, arising from damage done tf::r subterranean structures and utildies not <br />identffied oir gar ;urately located Iri addition, Client agrees to compensate CCIII:-t for any time spent or, <br />expenses incurred by GC in de%nse of any such claim with c*mpensation t'o be based upon MR's <br />prevailing teeschedule and expense reirnbursement policy,, <br />c. A continuous supply of potable water under minimium pressure for the use of the CCR crewwithin,100 feet <br />of the tank site, <br />d,. A cointinuloussuprAy of electricity during the (period of work: one 100 -AMP, 110/2.20, volt service for the <br />operation cif our power tools acid wxeassodes, located not more than '100 feet from the tank, Please be sure <br />that all circuit breakers are groun&,fault piroteCted,, If: it is necessary for CCR to supply its own electric <br />power, add $500,00 per week to the contract arnount,, <br />e. Any permit or other fees from any AFII as may be required for the work including but not limited to all <br />connect/disconnecti impact and buildingiconstrOction fees., <br />f. Drainage and disposal of the tank's cxmtents. <br />g. Refilling of the tank's contents. <br />h. Cleaning the exterior of the tank and accessories. <br />L Complete lock,out and tag -out of the subject tank prior to personnel entering the, tank. The Client will be <br />required to provide all materials for this process. "I"he Client will be responsible f6r demonstratingto <br />that the lock -out procedure is cornpIete and the tank is rendiered "safe" before GOCIR will performair, quality <br />testing to enter the tank. <br />j,, AH professional engineering design sh.avic.,les, <br />CCR0 I I -- Y? 60021 <br />