21-195- lnterioir '.rooitNfigAppiicaiPion
<br />Vero Florida
<br />April 310, 20, 21
<br />�Page 4
<br />(2) Abiasive blast to remove existang co tun rust, corrosion, mid other foreign contairninantsfrom the
<br />subawhate while achieving a minirrium angular ancl-ior profile of 3,0 mils.
<br />(3) Apply a prime coal of TriernecSeries 120 5100' 'Vinest r at 15,x,..18.10 mils. DF -F,
<br />(4) Apply a finish, coat of 1 nearer: Series 120-5001 Vinester at 15,0 18 .0 mils Dl V
<br />5 MATERIALS AND SERVICES FURNISJ IED BY .0 LI OR 074111ERS
<br />It is understood that the following slervilcesshatl be provided by others without expense toCCR�
<br />,a. Chent WH grant or obtain free access to the site for all equipment and personnel necessary for CC R, 'to
<br />perform th(� lwr,.)rk set forth in, this Proposal. The Client wilil notify any and all processors of the projec-1 site
<br />that Client has granted CCR free access to the site. C CR will take reasonable precautions to minimize
<br />damage to the site, but iit is understood by Client that, iru the normal course of work, some damage may
<br />occur,, and the correction of such damage is riot part of this Agreement unless so specified in the ProposaL
<br />b. The Client is responsible for the accuracy of locations for all subterranean structures and utilities, CCR will
<br />take responsible precautions to avoid known subterranean structures, and the Client waives any clairn
<br />against CCR 1, and agrees to diefend, indemnify, and hold CCR harmless from arry clairn or liability for injury
<br />or loss, including costs to defend, arising from damage done tf::r subterranean structures and utildies not
<br />identffied oir gar ;urately located Iri addition, Client agrees to compensate CCIII:-t for any time spent or,
<br />expenses incurred by GC in de%nse of any such claim with c*mpensation t'o be based upon MR's
<br />prevailing teeschedule and expense reirnbursement policy,,
<br />c. A continuous supply of potable water under minimium pressure for the use of the CCR crewwithin,100 feet
<br />of the tank site,
<br />d,. A cointinuloussuprAy of electricity during the (period of work: one 100 -AMP, 110/2.20, volt service for the
<br />operation cif our power tools acid wxeassodes, located not more than '100 feet from the tank, Please be sure
<br />that all circuit breakers are groun&,fault piroteCted,, If: it is necessary for CCR to supply its own electric
<br />power, add $500,00 per week to the contract arnount,,
<br />e. Any permit or other fees from any AFII as may be required for the work including but not limited to all
<br />connect/disconnecti impact and buildingiconstrOction fees.,
<br />f. Drainage and disposal of the tank's cxmtents.
<br />g. Refilling of the tank's contents.
<br />h. Cleaning the exterior of the tank and accessories.
<br />L Complete lock,out and tag -out of the subject tank prior to personnel entering the, tank. The Client will be
<br />required to provide all materials for this process. "I"he Client will be responsible f6r demonstratingto
<br />that the lock -out procedure is cornpIete and the tank is rendiered "safe" before GOCIR will performair, quality
<br />testing to enter the tank.
<br />j,, AH professional engineering design sh.avic.,les,
<br />CCR0 I I -- Y? 60021