fask : Perinitting (LUMP Sum)
<br />Pennitfing is airificipated to be: Ilimited to subinitfing a County, utility permil application
<br />forconnection to thercclairnc-d The ( ' ultant will prepare the neCeSS"Irry,
<br />Permit application and supporting diesign docurnents for submittal to the ("(writy for
<br />permit issuance - This task inc]udies up to two (2) resporrses to requestsfor additional
<br />infimnation. The County shall provide the pennit application fee, if applicable,. No
<br />adiditional permit applications are included in this task,
<br />It is not anticipated thialthe Florida I I )epartment of F,nvironmental Protection (l"
<br />1:will
<br />require modification to Lhe Coujjq's Solid Waste Operations perinit Similarly, F)EY
<br />does niol.
<br />to the reclaimedwatex systern, "I"his pt,qject
<br />is not anticipated to requin-, County Site Nan require
<br />modifications to the existing stormwater permits fi)r the site.
<br />Fask 5: Coustr,uetion Phase Services (Not -to -Exceed)
<br />will observre c(,onstruction wh/ifics for the dpiping modifications, GST
<br />c,oating and GST mod i fi cat ions. Otice Crom has coiftipleted the initial clicarfin,g and
<br />sandblasting M the tarda interior, the enginicer,�sffl condtict an
<br />internalvisual inspection of" the tank f6rstructural iritegrity-This Visoal inspection, will be
<br />limited to the extent of the tank wallvisible froar the floor of the tank, unless appropriate
<br />scaffolding is provided and in place by, Crorn. Due to the tank age, it is not anticipated
<br />that any, structural deficiencies will be: pivseril. C,rom will also be requirett to perform a
<br />detafled inspection offlic ta#*,� during the resurfacing effi,)n. Any structural deficiencies
<br />rioted during the observation v611 require addressing and erseparate authorizalion.
<br />Tile Consultant anticipates that the, consirruction phase maul span a duration of3 monChs'.
<br />During this time, the Consultant wifl prcwide ain average (W4 hours per week of
<br />i,wversight, as well as 2 U) 4 additional site visits b specialty technical personnel,and will
<br />'Y
<br />Prepare weekly summary reports in the form of an email to the appropriate County staff
<br />rnepn)ers, "rhe Consultant will specifically be on site to (.6serve any below -grade
<br />piping/componerits prior to backfilling, observe the tank walls prior to recoating,confirni
<br />appropriate coating isbeing titifized Prior to application, observe insullation of the,
<br />selected mixer, anid other key pr(iject inilestones agree(rl upon with the Coun�y.
<br />The County will conlracl directly Writh the contractar(pipelines) and ("Torn (lank
<br />modifications) to perform the work.The (,,onsultant vvill review, pay applications from
<br />each contractor on behall" ofthe County and pr l recornmendation, fj)r paryllielit or
<br />List i ficall ion for, reJection. "The C,onstidlant will paifrcil!.mte in a substantial c(�)mplcfion
<br />%Akthre,ugh at the appropriate point of constmetion and generate a punich list, if"
<br />�WppficaWc, to be addressed Iby ithe appropriate contractor,, as livieflas ec)ndiact a final
<br />W�IHWWOIU,gh to observe that each punCII fiSt jtrlt'ljmm has bevrt safisfctorfly, cornpleted.
<br />Consultant will not supervise, dimel, or cc:mlroj C'LontracU,)r's work, and ivill not have
<br />authority, t stop the Work or respo josibility fi t the means, metho ds, techniques,
<br />
|